Current capital improvement projects managed through the Engineering Department.
2nd St Curb Ramps (Lincoln to Park)
Downtown Curb Ramps Phase 5
Crosswalk Improvements Project Phase 4
Union Street Raised Crosswalk
W 11th Street Traffic Calming
Patterson/Grimes Resurfacing (3rd to Walnut)
E 10th Street Safety Improvements
Jefferson St (8th to 10th) Sidewalk Project
West Kirkwood Avenue Improvements Project
Grimes at Walnut Signal Replacement
Crosswalk Improvements Project, Phase 3
N Dunn St Multiuse Path (Bypass to Clover)
Indiana Avenue Safety Improvements
W. Countryside Ln. and Southern Pines Traffic Calming
Downtown Curb Ramps Phase 4
On-Call Geotechnical Services
On-call Geotechnical Engineering Services Throughout the City
Hopewell West - Jackson Street
Design, platting and construction of Jackson St.
High St (Arden to Hunter) Multiuse Path and Intersection Improvements
West 2nd Street Modernization and Safety Improvements
Hopewell East, Bloomington Hospital Re-Use (BHRU) Project
Demolition of existing buildings and full reconstruction of the area including new roads, Hopewell Commons Park, and a shared-use street.
B-Line Connection Project
This project will connect the existing B-Line Trail terminus at Adams Street with the multiuse path on the 17th Street I-69 overpass.