Project Summary:
This project is expected to include the following:
- Replace the existing traffic signal equipment at the intersection of Rogers Street and Kirkwood Avenue.
- Resurface the asphalt roadway along Kirkwood Avenue from Pine Street to Rogers Street.
- Replace and improve pedestrian curb ramps and crosswalks along Kirkwood Avenue from Pine Street to Rogers Street.
- Improve visibility along Kirkwood Avenue through minor on-street parking updates such as restricting parking near intersections.
- Address an existing pattern of crashes by restricting left turn movements from alleys and driveways located between Jackson Street and Rogers Street.
- Construct stormwater drainage improvements, potentially including green infrastructure features.
Kimley-Horn & Associates Inc. is the engineering design consultant for this project.
Project Timeline:
- Design: 2025
- Public Meeting: June 25, 2025
- Construction: TBD 2026
Public Meeting Details:
Date: June 25th, 2025
Time: 5:30pm - 6:30pm
Location: City Hall Council Chambers, 401 N Morton Street
Zoom Link for Virtual Attendance: https://bton.in/eng
You can provide comments on this project and provide your email address for future updates using the following link: https://forms.gle/ikyCAo96FeshWvvP9 This comment form will be active through July 13th, 2025.
Project Documents:
See draft concept plans attached below.
Bid and Award Information:
Project Contact:
- Neil Kopper, Senior Project Engineer, koppern@bloomington.in.gov