Project Summary:

This project will replace the existing traffic signal equipment and make intersection geometry improvements at the intersection of Rogers Street and Kirkwood Avenue. It will also include asphalt resurfacing, replacement of pedestrian curb ramps, and crosswalk improvements along Kirkwood Avenue from Pine Street to Rogers Street. Kimley-Horn & Associates Inc. is the engineering design consultant for this project.

 

Project Timeline:

  • Design: 2025
  • Construction: TBD 2025 or 2026

 