Skip to main content

Page last updated on June 11, 2025 at 3:06 pm

Project Summary:

This project is expected to include the following:

  • Replace the existing traffic signal equipment at the intersection of Rogers Street and Kirkwood Avenue.
  • Resurface the asphalt roadway along Kirkwood Avenue from Pine Street to Rogers Street.
  • Replace and improve pedestrian curb ramps and crosswalks along Kirkwood Avenue from Pine Street to Rogers Street.
  • Improve visibility along Kirkwood Avenue through minor on-street parking updates such as restricting parking near intersections.
  • Address an existing pattern of crashes by restricting left turn movements from alleys and driveways located between Jackson Street and Rogers Street.
  • Construct stormwater drainage improvements, potentially including green infrastructure features.

 

Kimley-Horn & Associates Inc. is the engineering design consultant for this project.

 

Project Timeline:

  • Design: 2025
  • Public Meeting: June 25, 2025
  • Construction: TBD 2026

Public Meeting Details:

Date: June 25th, 2025

Time: 5:30pm - 6:30pm

Location: City Hall Council Chambers, 401 N Morton Street 

Zoom Link for Virtual Attendance: https://bton.in/eng 

You can provide comments on this project and provide your email address for future updates using the following link: https://forms.gle/ikyCAo96FeshWvvP9  This comment form will be active through July 13th, 2025.

Project Documents:

See draft concept plans attached below.

Bid and Award Information:

Project Contact:

  • Neil Kopper, Senior Project Engineer, koppern@bloomington.in.gov