Project Summary:

This project has been prioritized by the Metropolitan Planning Organization to receive federal funding supporting construction of a multiuse path on North Dunn Street from the Indiana 45 Bypass to East Clover Lane. Local funding for design of this project was prioritized by City Council through a 2022 general obligation bond. This project will initiate with public outreach to inform the conceptual project plan, and then proceed into topographic survey and detailed design.

This project is intended to improve connectivity to multiple destinations including the Matlock Heights Neighborhood, Blue Ridge Neighborhood, and Griffy Lake Nature Preserve. Project goals include improving safety, accessibility, and mobility for all modes of transportation along this important corridor.

At this time no decision has been made regarding installing the path on the west vs east side of the street. Please let us know what factors you think should be considered in making that decision!

Project Timeline:

  • Design: 2025-2027
  • Public Input: begin March 2025
  • Right of Way Acquisition: TBD
  • Construction: TBD, estimated begin 2028

Public Input:

Public Meeting Details:

  • DATE: March 27th, 2025
  • TIME: 5:30pm – 6:30pm
  • LOCATION: The Sycamore Shelter of Lower Cascades Park (near the intersection of Club House Dr at Old SR 37)
  • DESCRIPTION: This public meeting will provide high level details about the project and gather input regarding design options.

The online comment form for this phase of input has closed.

Next phase of public input TBD.

Project Contact:

  • Neil Kopper, Senior Project Engineer, koppern@bloomington.in.gov