South Sare Road Crosswalk Islands This project installed two pedestrian islands along South Sare Road, one island at Winston Street and the other at Spicewood. Funding for the project was provided by the City Council Sidewalk Committee.
Tapp Road and Rockport Road Intersection Improvement Project The City is planning to reconstruct the Tapp Road/Rockport Road/Country Club Drive intersection, as well as improve the current 4-way stop with a new traffic signal.
The 7-Line The 7-Line will provide a protected east-west bicycle lane and improved bus corridor to connect the B-Line, downtown, Indiana University campus, and eastside neighborhoods.
Union (4th to 7th) Sidewalk Project This project would install a sidewalk on the east side of South Union Street from East 4th Street to East 7th Street.
Warning Signs Replacement/Relocation replacement/relocation of multiple warning signs within the City of Bloomington.
West Allen Traffic Calming This project will install two (2) raised crosswalks and one (1) speed hump on West Allen Street between S. Adams St. and Strong Dr.
Winslow (Henderson to Highland) Multiuse Path Project This project will install a multiuse path on the north side of Winslow Road from Henderson Street to Highland Avenue.
Winslow-Henderson Path and Intersection Improvements This project will construct a new multiuse path on East Winslow Road between South Walnut Street and South Henderson Street, a new multiuse path on South Henderson Street from East Winslow Road to approximately 650 feet north of East Winslow Road, intersection improvements for East Winslow Road at South Walnut Street Pike, and short sidewalk connections to adjacent facilities as necessary.