Project Summary:

Construction of approximately 220’ of new sidewalk along the east side of Dunn Street between 17th Street and the first parking lot entrance to the IU football stadium. Improvements include the enclosure of the existing ditch with new storm sewer piping and structures, regrading of the area, replacement of the IU parking lot entrance apron pavement, and a connection to the existing sidewalk.

 

Project Timeline:

  • Design: 2024
  • Bid: 10/2024
  • Construction: 2025

 

Project Documents:

(Disclaimer; all documents are for reference only. Official documents are located on OpenGov.)

 

Bid and Award Information:

 

S & J Excavation & Concrete, LLC    $141.774.00  -  Awarded 
Sub-Surface of Indiana, Inc.              $168.041.20
Monroe LLC                                         $195,970.00
Milestone Contractors, LP                 $198.375.00
E&B Paving-- Bloomington                $199.160.00
Crider & Crider, Inc.                           $214.588.24
Reed & Sons Construction, Inc.        $230.272.50
River Town Construction, LLC           $287.927.10

 

Project Contact:

  • Zac Rogers, Project Manager, zac.rogers@bloomington.in.gov

Attachments

Final Plan Set (2.01 MB)