This project will include installation of traffic calming devices along E Maxwell Ln from Henderson St to Woodlawn Ave. Traffic Calming devices include speed humps, pavement markings, and signs.
This traffic calming project was prioritized through the City's Resident-Led Process of the Traffic Calming and Greenways Program (TCGP). For additional information on this prioritization process, please contact the Planning and Transportation Department at 812-349-3913.
Project Timeline:
- Design: Fall 2022
- Construction: Spring/Summer 2023
- Construction Completion, May 5th, 2023
Quote Documents:
Letting Date: December 5, 2022
Award Date: December 6, 2022
Quote (Open):
E&B Paving, LLC: $36,900.00 (Awarded)
Milestone Contractors, LP: $98,851.00
No pre-Quote meeting is scheduled for this project.
Quotes are due in the City Hall Atrium by 11:30 AM on Monday, December 5th, 2022. Bids will be opened and read aloud at a virtual meeting, City Hall, 401 North Morton Street at 12:00 PM (Noon) on Monday, December 5th, 2022.
Results:
E&B Paving, LLC: $36,900.00 (Awarded)
Project Contacts:
- For questions related to the traffic calming process and project prioritization:
- Hank Duncan, Bicycle and Pedestrian Coordinator
- (812) 349-3529 or [email protected]
- For questions related to coordination during construction:
- Roy Aten, Senior Project Manager
- (812) 349-3913 or [email protected]
- For questions related to project design:
- Neil Kopper, Project Engineer
- (812) 349-3593 or [email protected]
Permit, Petition, Verification, and Occupancy Information
Certificate of Zoning Compliance (CZC) for Building Permit
If you need to apply for a building permit for a new triplex, fourplex, multifamily, commercial, institutional, office, industrial, or any non-Class 2 structure or anything requiring a building permit on a site containing those primary buildings, including a remodel or accessory structure, please apply through the Monroe County Building Department. This is the current process and will not be changing at this time.
If you need to apply for a building permit for a new single-family detached or attached, duplex, or townhouse structure or anything requiring a building permit on a site containing those primary buildings, including a remodel or accessory structure, you must apply for and receive your CZC through CivicAccess before you can apply at the Monroe County Building Department. These types of structures are referred to as Class 2 structures and are regulated differently beginning January 1, 2026 per Indiana Enrolled House Bill 1005. You must have a complete application in order to apply. The process and requirements are discussed on the Class 2 Structure Permitting Process page.
Permanent Sign Permit
If you need to apply for a sign permit for a Permanent Sign, please apply through CivicAccess.
Temporary Sign Permit
If you need to apply for a sign permit for a Temporary Sign, please apply through CivicAccess.
The previous sign permit application, though no longer in use, is available for reference of scaled site plan requirements.
Temporary Signs NOT requiring a permit - Yard Sign Placement Guidelines for when there is a:
Site Development Permit
If you need to apply for a site development permit for a site that has an approved site plan and/or a floodplain development permit in process, please apply through CivicAccess.
Floodplain Development Permit
If you need to apply for a floodplain development permit for work in the floodplain including building and earth movement, please apply through CivicAccess.
Temporary Use Permit
If you need to apply for a temporary use permit for a Temporary Use, please apply through CivicAccess.
The previous temporary use application, though no longer in use, is available for reference of scaled site plan requirements.
Zoning Verification Letter
If you need to apply for a zoning verification letter, please apply through CivicAccess.
Change In Use Permit
If you need to apply for a change in use permit, please access the application and submit a copy of the completed application and supporting site plan to [email protected] or you can supply a paper copy of the completed application and supporting site plan to the Department.
Occupancy Inspection
If your development site is completed to the temporary or final occupancy standards, please access the application and submit the application to [email protected].
Petition Documents
If you are applying for a zoning map amendment (rezone), planned unit development (PUD), site plan, primary or secondary subdivision, subdivision vacation, variance, conditional use, or an administrative appeal, please access the application and submit with your other documents at your petition filing appointment.
The 'DRC Calendar', otherwise known as the 2026 Meeting Schedule and Project Submission Deadlines Calendar, lists hearing dates for the Plan Commission, Plat Committee, Board of Zoning Appeals, and Hearing Officer. It also includes deadlines that must be met in order to appear at those hearings.
Planning and Transportation, Fee Schedule (effective 3-14-2022)