This project will construct improved crosswalks at up to 6 locations throughout the City. Additional location information will be available as the project progresses. Design and construction will be partially funded with federal funds.

VS Engineering is the preliminary engineering consultant for this project. Design will take place. Construction of this project is anticipated in 2025.

Project Timeline:

  • Design: 2023/2024
  • Construction: 2025