Project Details:

The Third Street Bicycle Lane Improvements project seeks to improve the separation between vehicle traffic and bicycle traffic on East Third Street. This project includes the installation of traffic separation barriers and delineators along East Third Street between approximately South Indiana Avenue and South Eagleson Avenue

 

Project Timeline:

  • Design: 2023
  • Bid: Dec. 2023
  • Construction: March 11th to March 16th

Project Documents:

(Disclaimer; all documents are for reference only. Official documents are located on OpenGov.)

 

Bid and Award Information:

 

Bid Results 12/15/2023

E&B Paving LLC         $35,200.00 - Awarded

 

Project Contacts:

Hank Duncan, Bicycle and Pedestrian Coordinator, at hank.duncan@bloomington.in.gov or (812) 349-3529

Zac Rogers, Project Manager, Engineering Dept. 812.349.3913 or zac.rogers@bloomington.in.gov