Other: The light cycle that lets outlet traffic from Deborah Drive appears to take longer and is timed. This change is not necessary as there is not enough traffic compared to Tapp Road to justify that length of a light cycle.
Also if the city should ever consider it that merge lane when heading east on Tapp road should either become a two lane all down Tapp to accommodate for traffic flow to pass around left turners into The Mill OR be gone entirely.
It just permits risky drivers to go into the right lane at this intersection knowing full well there is a line of cars waiting at the light cycle and that the lane merge is right after the light and they choose to "race" traffic and cut in when it is unnecessary. Even if one would argue a zipper merge there are times when it is necessary and in a populated neighborhood area it is not.
- Assigned to
- John Garzee
7/27/2026 09:55:25 Cheyenne Bowlen assigned this case to John Garzee
Sent notification to John Garzee
https://bloomington.in.gov/crm/tickets/view?ticket_id=212596
Cheyenne Bowlen assigned this case to John Garzee
You can use the link to follow progress on this case.
7/27/2026 09:47:31 Christina Smith assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=212596
Christina Smith assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.
7/23/2026 18:53:08 Anonymous assigned this case to Christina Smith
Sent notification to Christina Smith
https://bloomington.in.gov/crm/tickets/view?ticket_id=212596
Anonymous assigned this case to Christina Smith
You can use the link to follow progress on this case.
7/23/2026 18:53:08 Opened by Anonymous