City Construction Projects
100 E 6th ST
- Case Date:
- 4/7/2000
due to the project at 7th and Walnut the lack of striping in the 100 Block of E. 6th is even more critical than before. Please ASAP stripe the angle parkinging in the 100 jBlock of E. 6th.
City Construction Projects
1809 E Southdowns DR
- Case Date:
- 10/4/1999
STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK
City Construction Projects
309 N Walnut ST
- Case Date:
- 6/16/1999
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
City Construction Projects
1150 S Clarizz BLVD
- Case Date:
- 2/9/1999
Clarizz Boulevard gate open despite local plan for site that requires it to be closed until mid April. Please take legal action.
City Construction Projects
2100 S Bent Tree DR
- Case Date:
- 2/3/1999
Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.
City Construction Projects
925 S Ballantine RD
- Case Date:
- 10/22/1998
The residents at 925 S. Ballantine had a contractor make a street cut across Ballantine. The cut is sinking in and has become dangerous.
City Construction Projects
2610 S Rockport RD
- Case Date:
- 8/31/1998
Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.
City Construction Projects
111 S ROGERS ST
- Case Date:
- 8/20/1998
Mrs. Myers called on behalf of her son, Joe Myers, because the alley-way running from Rogers St. east -west near the Rogers St. fire station needs to be paved. She wants the Street department to have more money so that they can pave her alley sooner than the fall of 1999, when Bobby Chestnut told her it would be paved.
City Construction Projects
111 S ROGERS ST
- Case Date:
- 8/20/1998
Mrs. Myers called on behalf of her son, Joe Myers, because the alley-way running from Rogers St. east -west near the Rogers St. fire station needs to be paved. She wants the Street department to have more money so that they can pave her alley sooner than the fall of 1999, when Bobby Chestnut told her it would be paved.
City Construction Projects
2308 S Cutter CT
- Case Date:
- 7/8/1998
(Please call the above complainant for additional information). Says Utilities dug a hole to install a manhole and did not finish grading around it.