City Construction Projects
- Case Date:
- 4/13/2012
Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction?
Thanks,
Gerry Matthews
City Construction Projects
- Case Date:
- 2/7/2012
Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east
City Construction Projects
806 W 4th ST
- Case Date:
- 6/20/2011
The sidewalks in front of 806 & 810 W. 4th Street are in very poor condition. They are crumbling and cracked. They are hazardous to walk across and need to be replaced.
City Construction Projects
1924 E Marilyn DR
- Case Date:
- 4/5/2011
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
City Construction Projects
401 N Morton ST
- Case Date:
- 5/25/2005
citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".
City Construction Projects
2215 W 3RD ST
- Case Date:
- 6/16/2004
Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 1/8/2004
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 10/20/2003
Desires a cleanout for the slotted drain in the driveway.
Desires a tree well for the gum tree on north side of drive.
Desires drainage improvements on the southeast side.
Desires opening in the median.
City Construction Projects
1124 S College Mall RD
- Case Date:
- 10/16/2003
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.
City Construction Projects
1101 N COLLEGE ST
- Case Date:
- 6/20/2003
Line torn out by contractor with backhoe.