City Construction Projects
3549 N Hackberry ST
- Case Date:
- 5/18/2025
Our neighborhood recently had our sidewalks updated to be ADA acceptable and with that our driveway and sidewalk by our house was tore up. The photo above is a spot in the sidewalk they did not fill with concrete and is a hazard to anyone walking. They also left big gaps in our yard where they fixed the sidewalks which is another hazard. If we could have someone come out and look and fix this issue so no one gets hurt.
City Construction Projects
Hillside Dr
- Case Date:
- 5/16/2025
Why there road work on that intersection
City Construction Projects
723 W Allen ST
- Case Date:
- 3/29/2025
Entire roof being removed in historic district - concerns it is not permitted work and concerns for spread of moldy / asbestos contaminated insulation being thrown
City Construction Projects
3625 E Morningside DR
- Case Date:
- 2/26/2019
the western end of Morningside Drive--west of Smith Road--has long been unsafe because there are no sidewalks. There are several families with young children, many residents walking dogs and walking to the park, and sidewalks would greatly improve general safety. thanks.