8/11/2026 16:55:22 Closed by John Garzee
Thank you for reaching out. We understand there is currently more traffic in this area because of the construction detour, which can make the three-way stop feel more disruptive than under normal conditions.
We do not plan to remove the stop sign at this time. It helps provide access for residents entering Winslow from the side street, particularly during periods of heavier traffic. Once the construction detour is over and traffic patterns return closer to normal, we can reevaluate the intersection to see whether the existing stop control is still appropriate.
Sent notification to John Garzee
https://bloomington.in.gov/crm/tickets/view?ticket_id=212901
Closed by John Garzee
Thank you for reaching out. We understand there is currently more traffic in this area because of the construction detour, which can make the three-way stop feel more disruptive than under normal conditions.
We do not plan to remove the stop sign at this time. It helps provide access for residents entering Winslow from the side street, particularly during periods of heavier traffic. Once the construction detour is over and traffic patterns return closer to normal, we can reevaluate the intersection to see whether the existing stop control is still appropriate.
8/11/2026 06:42:03 Cheyenne Bowlen assigned this case to John Garzee
Sent notification to John Garzee
https://bloomington.in.gov/crm/tickets/view?ticket_id=212901
Cheyenne Bowlen assigned this case to John Garzee
You can use the link to follow progress on this case.
8/6/2026 07:36:47 Anonymous assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=212901
Anonymous assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.