open #210470
Trash
529 E 1st ST
- Case Date:
- 5/4/2026
All of the new construction along Jefferson between third Street and 10th St. where they’ve made street cuts for the sewer lines need to be repaired. I believe it’s the responsibility of the contractor to repair the street and none of these repairs look to be permanent.
I’m extremely disappointed with how the project on 2nd is being handled. Someone needs to take responsibility and manage this properly. I had an appointment and was late, not because of anything I did, but because access to the business was completely blocked. I then tried to use the alley as an alternative route, only to find that it was also closed due to construction. This level of poor planning is unacceptable. If both the main access and the only alternative route are shut down at the same time, what exactly are people supposed to do, fly?
Piece of pavement missing around the manhole cover in front of the Travelodge
Potholes
Brown water coming from tap.
Dumpster partially blocking sidewalk. I have reported this several times and it keeps happening. Can you find them, or fix it, or am I just wasting my time?
One of Duke/Xfinity lineman trucks was doing work along E. Winslow Rd in Bloomington IN. The truck left many ruts in the setback grass that need repair. Also, cut cable pieces were left on the ground/sidewalk. Both of these issues need to be resolved. Thank you
Grass getting over a foot tall