Nuisance Lights
1499 W 2nd St
- Case Date:
- 4/27/2025
The light going east/west on 2nd/Bloomington Rd is very short (at least on certian days and times). I've been in lines with piles of cars for this light with only a few get through each time, making you stop for several light rotations on an otherwise traffic free drive. Usually only a few cars (and sometimes absolutely none) go through the light in the north/south direction while the east/west lines are waiting. Thought this was weird, and it doesn't always happen, but it's annoying when it does.
Traffic Related Complaints
315 W Dodds ST
- Case Date:
- 4/27/2025
There is a hole in the road. It’s a hazard for motorists & bicyclists.
Potholes, Other Street Repair
Rogers & Dixie
- Case Date:
- 4/26/2025
Pothole on Dixie just west of Rogers
Potholes, Other Street Repair
Rogers & Dixie
- Case Date:
- 4/26/2025
Pothole on Dixie just west of Rogers
Potholes, Other Street Repair
804 S Rogers ST
- Case Date:
- 4/26/2025
Pothole
Potholes, Other Street Repair
603 S Jordan Ave
- Case Date:
- 4/26/2025
Potholes at Eagleson and 2nd St, on 2nd St just east of intersection.
Traffic Signals
1499 W 2nd St
- Case Date:
- 4/26/2025
The traffic signal at Adams and 2nd/Bloomfield seems to be functioning incorrectly. Traffic is very backed up at the time of this report.
Potholes, Other Street Repair
2023 E Maxwell LN
- Case Date:
- 4/26/2025
Very deep pothole near the sewer opening on the north side of Maxwell Lane, about a block west of High Street.
Potholes, Other Street Repair
605 W 1st St
- Case Date:
- 4/26/2025
Other: Over the past 4 years, W. 1st street from Walker to edge of Hopewell (near Fairview) was used extensively, often daily, during demolition and construction with heavy equipment and trucks often idling there waiting to move closer to the Hopewell construction area. . As a result that end of the street as well as the curve onto Wylie/Euclid street experienced a lot of wear and tear; periodic potholes, sidewalks closed at times, spray painted utility markings. Are there any plans to pave and repair the street and shoulders that are technically in McDoel Gardens? It definitely would show a measure of goodwill for all that the near neighbors and businesses have experienced as Hopewell emerges. W. 1st towards Rogers and onward looks great with paving, new sidewalks and street lamps.
Potholes, Other Street Repair
320 W 8th St #113
- Case Date:
- 4/26/2025
Over the past 4 years, W. 1st street from Walker to edge of Hopewell (near Fairview) was used extensively, often daily, during demolition and construction with heavy equipment and trucks often idling there waiting to move closer to the Hopewell construction area. . As a result that end of the street as well as the curve onto Wylie/Euclid street experienced a lot of wear and tear; periodic potholes, sidewalks closed at times, spray painted utility markings. Are there any plans to pave and repair the street and shoulders that are technically in McDoel Gardens? It definitely would show a measure of goodwill for all that the near neighbors and businesses have experienced as Hopewell emerges.
W. 1st towards Rogers and onward looks great with paving, new sidewalks and street lamps.