uReport

City of Bloomington, Indiana

closed: Resolved #202288

Potholes, Other Street Repair:

Other: Other: Over the past 4 years, W. 1st street from Walker to edge of Hopewell (near Fairview) was used extensively, often daily, during demolition and construction with heavy equipment and trucks often idling there waiting to move closer to the Hopewell construction area. . As a result that end of the street as well as the curve onto Wylie/Euclid street experienced a lot of wear and tear; periodic potholes, sidewalks closed at times, spray painted utility markings. Are there any plans to pave and repair the street and shoulders that are technically in McDoel Gardens? It definitely would show a measure of goodwill for all that the near neighbors and businesses have experienced as Hopewell emerges. W. 1st towards Rogers and onward looks great with paving, new sidewalks and street lamps.

Assigned to
Cheyenne Bowlen

Most tickets of this type should be closed within 7 days, although some cases may be longer. 2 days have already passed.

History

4/28/2025 09:35:25 Closed by Cheyenne Bowlen

W 1st St is not on our 2025 Paving List. I have made a note to evaluate it for our 2026 Paving List and have added it to our patch list to patch any potholes.

Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=202288 Closed by Cheyenne Bowlen W 1st St is not on our 2025 Paving List. I have made a note to evaluate it for our 2026 Paving List and have added it to our patch list to patch any potholes.

4/26/2025 08:07:29 Anonymous assigned this case to Cheyenne Bowlen

Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=202288 Anonymous assigned this case to Cheyenne Bowlen You can use the link to follow progress on this case.

4/26/2025 08:07:29 Opened by Anonymous

605 W 1st St

CityBloomington
StateIN
Latitude39.159427642822
Longitude-86.539642333984

Other cases for this location

StatusCase DateCategory