City Performance
3811 E Morningside DR
- Case Date:
- 5/14/2025
Crews are there putting in sidewalks they said we never got in notice about this I am the manager for this property. Please give us a detail letter of what will be taking place and the timeline please. This is in front of Yorktown Courts
City Performance
700 S Eastside Drive
- Case Date:
- 4/9/2025
The fiber optic cable pit at 700 S Eastside Drive (right next to the No Parking Any time sign) is missing its (green?) cover, so now there is a big hole in the grass.
I think it was blown off by a recent storm.
City Performance
417 N Elm St
- Case Date:
- 3/3/2025
The fiber crews were on our street and parked heavy machinery in my parking lot, they punctured a hole in my asphalt and scratched the concrete of my green space.
City Performance
2001 E Viva DR
- Case Date:
- 1/13/2025
The crews that installed the digital fiber in front of my house cut down some small trees, but didn't haul away the branches. The chipper truck came through and picked up tree debris from other yards, but not from mine. Can it still be picked up?
City Performance
2057 E Cheyanne LN
- Case Date:
- 8/6/2024
Hi there,
I wasn't sure what section to file this complaint under, since it is related to a loud construction project that has been ongoing on High street for several weeks. There was no major issue up until today, August 6. It is now almost 10:30 PM and the construction has not finished for the night. There is a loud machine (a pump, maybe?) that has continually run since about 8:30 pm and is showing no sign of stopping. We have small kids who are sensitive to noise, and we live right next to the construction. I understand the workers have to complete their task, but to go this late at night seems disruptive to folks in the area.
Thanks.
- Case Date:
- 12/5/2017
To: Mayor Hamilton, if you could please look at ureport case #161401 from october 3. now it is 2 months later & that crosswalk button at a very busy intersection (west 3rd st & franklin) still isn't fixed. i see mr. cibor's note there from oct.18 but even if he has to coordinate with another agency, it still shouldn't take this long. i am afraid i am going to get hit by a big truck. i cannot walk very fast because of medical problems. also, there will be snow & ice soon, making crossing there even more difficult.
- Case Date:
- 11/14/2017
What used to be a 10 minute drive to work now takes close to 35. Why? Construction on Tapp, 37, Rodgers, Walnut, 10th Street, Dunn, Fee, and Gordon Pike closed. There is literally not any route left to get to work. Everyone on the south side is forced to sit in traffic for two to three times the normal length due to terrible planning by the city in the closing of streets and construction that has effectivity shut down part of the city and prevent us from going anywhere or doing anything.
- Case Date:
- 10/3/2017
a few weeks ago i wrote on ureport about the missing crosswalk button device at the intersection of west 3rd street & franklin. later when i looked at ureport again i could see that a city engineer had contacted the i-69 project to tell them it was their problem. it still didn't get fixed, so i called the phone # for 1-69 & left a voice message. a man from there called me back & said that their project doesn't go that far, so it's up to the city to fix that. his name is kirk roth so if there is still a dispute, please call him at the phone# on their website. this needs to get resolved please for pedestrian safety at a very busy intersection. people who live on yancy etc need to cross there to get to the bus-stop across the street to go to work. thanks