uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (126)

open #204935

Potholes, Other Street Repair

Case Date:
8/14/2025

I had sent in a request on 5/19/25 Case #202787 reporting that Olive Street needs a concrete curb installed. Due to the excessive rainfall this has caused flooding issues for 1502 S. Olive and the house on the corner of Hillside and Olive (1144 E. Hillside Dr.). I was informed that this was on the paving list and there was plans for an asphalt curb. I called on 6/9/25 and spoke to the Engineering dept. (Iris) about installing a concrete curb instead of asphalt. There is already a partial concrete curb that runs past 1502. It needs to have a concrete curb all the way up the hill so that rain will not flood into the driveway and along the house of 1502, plus it runs past the curb into the yard of 1144 E. Hillside causing flooding in the basement. They have a sump pump now, but it's old and could quit at any time. It's already August and there hasn't been any kind of activity on this street. Do you have an estimated date as to when the street will be paved and the curb installed? Also, there is a construction sign in the yard of 1144 E. Hillside that has been there all summer and would like it to be moved. Thank you for any information you can provide!

closed #204830

Potholes, Other Street Repair

917 E Grimes LN

Case Date:
8/11/2025

Previously reported this hole. Took 6 or more weeks for someone to repair. Put asphalt on top which lasted almost 2 weeks before opening up again. 15" hole needs FILLED with dirt/gravel before asphalt

closed #204729

Potholes, Other Street Repair

300 W Brookdale DR

Case Date:
8/6/2025

Over a year ago, new water lines were installed along Brookdale to accommodate a new apartment complex on the west side of Kinser Pike. (Aspen Apts.) That construction dug up parts of the yards of the houses on Brookdale as well as part of the street itself. The street was never repaved and the areas that were covered up with dirt become muddy when it rains.

closed #204611

Potholes, Other Street Repair

Rogers Rd & Spicewood Ln IB

Case Date:
7/31/2025

Brand new intersection —-ponding water on crosswalk. The water drained fine before the street was repaved.

closed #204528

Potholes, Other Street Repair

1340 E Sheridan DR

Case Date:
7/27/2025

In installing a main fiber line, Trueline/AEG or its partner, removed the asphalt at the edge of the street and cut out a foot wide section of the city's paved drainage ditch. Erosion has occurred and further breakup of asphalt is likely. The area needs to be repaired and patched by someone.

closed #204188

Potholes, Other Street Repair

2907 S Spicewood LN

Case Date:
7/13/2025

There is a water drainage issue at Spicewood ln across from Sherwood Oaks church on the project that is being complete. The water is not draining at this location. Also, the sidewalk from here to the roundabout at Sare road is extremely overgrown making it single file for bikers, runners and walkers in multiple areas.

closed #203977

Potholes, Other Street Repair

302 S College Ave

Case Date:
7/5/2025

Open utility pit right in the sidewalk north of the convention center. S side of 3rd Street. Major trip hazard.

closed #203525

Potholes, Other Street Repair

2532 N Skyline DR

Case Date:
6/18/2025

I live in Northwood Estates and travel daily on Kinser Pike from the bypass just to get home. After living here for 22 years, the amount of traffic has increased tremendously, especially BIG trucks. For the past 2 weeks, barrels, tape, etc have been placed there, restricting northbound turning in the left lane separately. What are the specific plans for the development and completion of this project? PLEASE complete this project before school resumes at Arlington and Bloomington High School North because in 1 afternoon I counted 28 buses going Southbound to the bypass. In advance, thank you for replying.

closed #203103

Potholes, Other Street Repair

2006 S Bernard DR

Case Date:
6/2/2025

Hello - I am the manager of the Osage Place Homeowner Association. The Board of the Osage Place neighborhood is wondering if it is possible to stripe parking spaces on Bernard Street. The goal is to help identify parking spaces and alleviate those parking improperly and leaving large distances (but not enough to park) when parking on the street. The homes on the west side of Bernard do not have off-street parking, so they must utilize the on street spaces. Thank you, Suzanne OConnell (Focus Property Mgt) 812.200.6128 Tel

closed #203089

Potholes, Other Street Repair

917 E Grimes LN

Case Date:
6/2/2025

Fiber optic install hole opened up at NW corner 900 E Grimes Ln & 1200 S Woodlawn St. It's at least 1.5 foot deep.