uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (52573)

open #212116

Street Trees

923 S Rolling Rock DR

Case Date:
7/2/2026

The back of my property faces Allen Street, between Adams Street and Larkspur Lane. There is a tree by Allen Street (on the other side of the sidewalk behind my property) that is leaning, and some branches are starting to touch the fence around my backyard. Is it possible to trim that tree?

open #212055

Trash

1200 E Hillside DR

Case Date:
6/30/2026

It seems someone threw a mattress in my yard and I don't have a way to get rid of it. Can the city pick this up? 1200 E Hillside Dr thank you.

open #211924

Excessive Growth

1711 e winslow

Case Date:
6/25/2026

Overgrown grass in median making it dangerous to pull out on main road Winslow because you can’t see cars driving over the blind hill. A neighbor said they already reported this but the city has yet to take any action so I am reporting this aswell. Very overgrown and this will eventually cause a car crash or bike/pedestrian injury due do low visibility.

open #211913

Biking & Walking

2656 E Covenanter CT

Case Date:
6/24/2026

Vegetation overhanging sidewalk. West side of College Mall Road, just north of Covenanter.

open #211811

Trash

1136 S Morton ST

Case Date:
6/20/2026

Homeless in a tent with camp setup

open #211799

Trash

115 S WALNUT ST

Case Date:
6/20/2026

Trash pile left behind

open #211790

Blocked Street

4100 E Bill Mallory BLVD

Case Date:
6/19/2026

Not an emergency, but tree limbs are hanging in the middle of the road. Cars can’t get through without having to dodge it. Thank you for your time.

open #211770

Excessive Growth

2212 S Belhaven CT

Case Date:
6/18/2026

Excessive Growth. Abandoned construction debris.

open #211472

Yard Waste

707 S Grant ST

Case Date:
6/8/2026

Today was a scheduled yard waste pick up day and yard waste bag remains at the curb. Has not been picked up.

open #211439

City Construction Projects

3230 S Walnut ST

Case Date:
6/8/2026

Sidewalk at the ongoing construction at new Bloomington Fire Operations Center is blocked with no alternate accessible path for pedestrians. Wheelchair user had to use the vehicle driving lane on busy road in order to get around the blocked sidewalk, because the shoulder of the road was also obstructed by cones and tape.