City Performance
700 S Eastside Drive
- Case Date:
- 4/9/2025
The fiber optic cable pit at 700 S Eastside Drive (right next to the No Parking Any time sign) is missing its (green?) cover, so now there is a big hole in the grass.
I think it was blown off by a recent storm.
City Performance
1545 S Strong DR
- Case Date:
- 4/29/2025
The unhoused encampment behind the IMI concrete plant on private property has continued to get out of control. This has been cleared out already and has now grown to the largest size to date. We have seen 50+ people on a daily basis back and forth. More and more of the unhoused have been cutting through private property on Cherokee Drive, leaving trash in yards, starting fights in the area, and continuing to scope out an abandoned house at the end of Cherokee to which the cops have been called out to at least twice. There is a brand new subdivision being built at the end of Cherokee and the area is finally being built up along with the addition of Switchyard Park. Bloomington has numerous services for the unhoused but camping on private property and causing issues to nearby neighborhoods should not be tolerated. The fear in the area is that this is becoming more and more unsafe as this encampment continues to grow in size. Please address this increasingly dangerous situation as soon as possible.
City Performance
2496 W 3rd ST
- Case Date:
- 4/26/2025
For Council & Mayor Offices: The whole near west side within city limits that leads to what everyone considers the actual west side of Bloomington (whether in city limits or not) is being very poorly zoned and utterly bad development. The city never prioritizes parks or other greenway features - or even just simple street trees and better vegetation requirements. All the businesses over here continue to get gigantic parking lots and the less popular zoning cases (i.e. rehabilitation centers) are pushed to the west side. Where are these items on the east side of town? Or north? This is inequitable zoning and use of resources focused only to east side and downtown residents. We want to see better.
City Construction Projects
1016 S Mitchell ST
- Case Date:
- 4/2/2013
A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.
City Construction Projects
700 S Walnut ST
- Case Date:
- 9/9/1996
Ms. Borhan said the City tore up her driveway approximately a year ago and promised to return landscaping and everything back to "as was". She has not had any landscaping done and there is mud at the driveway.
City Construction Projects
1409 S Madison ST
- Case Date:
- 7/24/1996
1200-1300 S.MADISON (FROM GRIMES TO HILLSIDE) REYNOLDS CONSTRUCTION DOING
WORK FOR UTILITIES DEPT. EXCESS DIRT/SAND NEEDS TO BE SWEPT UP.
City Construction Projects
1105 S Rogers ST
- Case Date:
- 5/15/1996
recent cut--cut repair is very rough and deteriorating
City Construction Projects
418 W Joy ST
- Case Date:
- 1/17/1996
Wants information regarding proposed development at the intersection of S. Rogers and Rockport Road. Also, upset that these roads and sidewalks may be widened unnecssarily and the elderly do not need extra taxes. The speed limit on rogers should be lowered too.
City Construction Projects
1204 E Wylie ST
- Case Date:
- 5/17/1995
A section of sidewalk was removed last fall and was never replaced.
City Construction Projects
1124 S College Mall RD
- Case Date:
- 10/16/2003
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.