uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (119504)

closed #202929

Trails

E Lanam Rd

Case Date:
5/25/2025

Trees down, blocking the Lanam Trail, not far from the Lanam Road trailhead.

closed #202796

Excessive Growth

301 E Cottage Grove AVE

Case Date:
5/19/2025

North side of lot along alley is overgrown with huge vines growing up the trees (wintercreeper, ivy, etc.) that are a hazard. Also, bush honeysuckle and tree-of-heaven growing on east property line in the back near the alley, growing into neighboring property.

closed #202898

Excessive Growth

516 N Grant ST

Case Date:
5/23/2025

"Campus Walk - Grant North" apartment building has tree-of-heaven (!) growing around its dumpster on the NE corner of the lot by the alley. There are small ones, but also a very large one that is the source of the problem.

closed #170762

Blocked Sidewalk

126 S Roosevelt ST

Case Date:
10/20/2019

Lime scooters blocking sidewalk. Date: 10/20/19. Time: 3:30PM. Location: near 126 S. Roosevelt St. We tried to move them out of the way but the wheels lock up unless we pay.

closed #202905

Line of Sight

346 S Davisson ST

Case Date:
5/23/2025

There is a large plant/tree growing into the corner of S. Davisson & W. Smith Ave. It makes it impossible to see around the corner to either drive straight on Smith or turn either direction on Davisson when stopped at the stop sign on Smith & Davisson.

closed #202897

Excessive Growth

217 E 10th ST

Case Date:
5/23/2025

Japanese knotweed growing all around deck-like area in backyard on NE corner of lot.

closed #202957

Line of Sight

1200 S Park AVE

Case Date:
5/27/2025

Growth up to the corner of both 1200 and 1201 make it hard to see for both cars and pedestrians turning off of or onto S park to the south

closed #202956

City Performance

2704 S. McCartney Lane

Case Date:
5/27/2025

Over the holiday weekend, we had yet another water main break in Hyde Park Village. Happy to report that CBU was quick on the scene fix the problem and mostly cleaned up the mess. I would like to speak with someone regarding the issues as this was our second water main break in two weeks. I am the president of Hyde Park Village homeowners association. Please have someone contact me as soon as possible. Thank you.

closed #202961

City Construction Projects

2012 E Hillside DR

Case Date:
5/27/2025

The construction contractor has placed the Road Closed barricades in two of the three lanes on High St. at the Hillside intersection. This is impeding the flow of traffic and is going to cause an accident. Once three cars fill the left turn lane, High St. is effectively blocked to North/South travel. There is now only more traffic going North on High St. with the roundabout closure. Please have the barricades removed or placed to the sides of the road. If someone cannot read the road closure signage properly, they will have to pay the price once they reach the closed roundabout.

closed #202977

Street & Traffic Signs

2012 E Hillside DR

Case Date:
5/27/2025

With Rogers closed off everyone who lives off High street has to go up to use Moores Pike. The Road Closed sign on south High Street is too close to the light. If just one car on northbound high street is in the left hand turn lane, no cars can access southbound high street. Sign needs to be moved back significantly or need to deaignate left hand turn lane for southbound traffic. Thank you.