uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (51321)

closed #85222

Recycling

1409 S Park AVE

Case Date:
9/9/2008

Recyclable items not properly sorted. Must be sorted for pick-up 945 las

closed #120117

Trash

1409 S Park AVE

Case Date:
2/21/1997

##RM##### Says recycle has been missed before. Men just went by this morning-- no note.

closed #140808

Recycling

1409 S Park AVE

Case Date:
9/8/2014

closed #95908

Trash

1409 S Park AVE

Case Date:
7/8/2005

exceeds 40lb limit

closed #95964

Trash

1409 S Park AVE

Case Date:
6/24/2005

Exceeds weight limit of 40 lbs. Too heavy 944

closed #192644

Utilities Construction

1409 S Park AVE

Case Date:
8/2/2024

Fiber contractor hit house sewer line—sewer is now backed up.

closed #207776

Potholes, Other Street Repair

1409 S Park AVE

Case Date:
1/26/2026

While redoing the Templeton elementary playground over the past year and a half many heavy construction vehicles used the two blocks of South Park Ave as their main access point for construction. During that time the road conditions on those two blocks of South Park ave (from Grimes to Hillside) have worsened becoming hazardous, with many potholes that need to be avoided like obstacles to dodge left and right. There are no sidewalks on this street so many kids walk to Templeton in the street, with the potholes creating further distraction for drivers. The construction crew hired was very respectful of the neighborhood, but the additional wear from the large project needs to be prioritized and addressed. Thank you for your time.

closed #155523

Recycling

1409 S Rogers ST

Case Date:
9/6/2016

no aerosol cans

closed #150031

Recycling

1409 S Rogers ST

Case Date:
12/29/2015

paper,card board other separate bins 939

closed #74899

Recycling

1409 S Rogers ST

Case Date:
3/2/2011

Recycable items not properly sorted.