Traffic Related Complaints
748 N Oolitic DR
- Case Date:
- 7/27/2020
Nope, Public Works was wrong. Drivers exiting from the rear of Union at Crescent aren't going out 14th. They are going to W. 11th via N. Oolitic. Since that exit opened, traffic on Oolitic has tripled and they don't all come down the hill heading South at a kid-safe speed. Thanks for upgrading the infrastructure before development, Hamilton.
Excessive Growth
1007 W Pinehurst DR
- Case Date:
- 7/24/2020
overgrowth of trees & bimpending umpeeding the passability of sidewalk
Line of Sight
744 Ridgecrest Court, Bloomington, IN 47401, USA
- Case Date:
- 7/23/2020
Weeds growing along w 2nd Street makes taking a left turn out of Euclid very dangerous. Can’t see oncoming cars
Excessive Growth
932 S Henderson ST
- Case Date:
- 7/22/2020
- Case Date:
- 7/21/2020
South side of Tapp Road just East of I-69.
Caller had no exact location. Sidewalk is obstructed.
- Case Date:
- 7/21/2020
Dumpster in alley is full and overflowing onto the ground
Traffic Suggestions
North Oolitic Drive
- Case Date:
- 7/19/2020
I have spoken with Public Works and Planning & Transportation previously but i would like to put it out there again since there has been a lot more progress on Union at Crescent. I would like to put in a request that N.Oolitic Dr from the rear exit of Union at Crescent to W.11th St be rebuilt with widening and curb/sidewalk combos to full ROW width. In addition, i still request that the intersection at N.Oolitic and W.11th be turned into a 3-way stop (signs, not lights.) I truly appreciate serious consideration of these matters and I will work with the city in any way I can, within reason, with my adjacent property. Thank you.
Blocked Sidewalk
2000 E Wexley RD
- Case Date:
- 7/17/2020
Sidewalk here at the NE corner of High & Winslow is overgrown again, making access to the Jackson Creek Trail difficult for families with strollers, kids on bikes, etc. This has been an ongoing issue for several summers now. Can you please find a permanent resoution to keep this pathway clear and accessible?
Potholes, Other Street Repair
1800 S Henderson ST
- Case Date:
- 7/16/2020
The summer road construction left the northbound lane of S. Henderson gravel with no pavement. This was a fine temporary solution, but the extended length of the lack of pavement has resulted in extremely rough and pitted roadway. Drivers are choosing to drive North in the Southbound lane instead and causing dangerous traffic situations. Can someone expedite either adding more compacted gravel or actually paving this piece of road? It is dangerous to drivers and their vehicles.
City Construction Projects
Miller & Henderson, Bloomington, IN 47401, USA
- Case Date:
- 7/16/2020
For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.