I appreciate the paving happening and the difficulty in controlling traffic around it downtown, but the crews need more signs and flaggers ASAP
I appreciate the paving happening and the difficulty in controlling traffic around it downtown, but the crews need more signs and flaggers ASAP
Why are the street cuts so poorly done and do called repaired 2nd street. Done are not bad and others are terrible. I understand that a new road is supposed to going in, but our cars are getting beat up. Also since when does the city allow patching concrete sidewalks with asphalt? I assume all that is coming out to be replaced with concrete again. I assume we’re having lovely bike lanes incorporated into this new construction project that very few people will use. Thank you for using our tax money to a fullest extent of your dreams.
Branches overhang sidewalk too low to walk under
Container blocking sidewalk.
Sidewalk is half blocked by overgrown bush.
Couple weeks ago, some contractor dug up 7~9 holes on kinser pk between rosewood and acuff rd. I think they were installing natural gas pipe. They buried it and filled it with concrete but never finished it with asphalt on top as concrete wasn't filled all the way to the top. (The white patches in the picture) It's very bumpy when you drive over it. I am concerned with two points, 1. They just paved Kinser Pk not long ago and this is going to deteriate the road that city just re-paved if they don't fix it soon. 2. People are resorting to driving on the other side of the road to avoid the holes, including school buses. This is not a safe situation. Again, I would have thought they would come back and finished it quickly but it's been many weeks and I am starting to be concerned. Thanks.
The traffic light at S. Walnut Street and South Drive keeps turning red for Walnut traffic without any vehicle or pedestrian traffic on South Drive. It stays red for a very long time. This is weekdays, weekends, evenings, 7:30am this Sunday morning. It's very disruptive to traffic.
Light pattern needs looked at! Always red on n walnut st. with NO traffic coming from a dead end south st. Needs adjusted to traffic patterns!!
The repairs on the street cuts near Walker st and west 2nd are very poorly done. No excuse for drivers having to slow to 10 miles per hour to go through these multiple street cuts, to avoid damaging their vehicle.
Several cars being repaired by outside workers. Now at 8:48pm someone is stripping paint off a car and making a very continuous loud noise while blocking the side walk. At least 5 old cars being repaired in front of this house all day and during the night.