7/8/2026 15:03:23 Closed by Kyle Baugh
Milling and repaving this section of roadway will start tomorrow 7/8/26 and be expected to wrap up next week.
Other: Couple weeks ago, some contractor dug up 7~9 holes on kinser pk between rosewood and acuff rd. I think they were installing natural gas pipe. They buried it and filled it with concrete but never finished it with asphalt on top as concrete wasn't filled all the way to the top. (The white patches in the picture) It's very bumpy when you drive over it. I am concerned with two points, 1. They just paved Kinser Pk not long ago and this is going to deteriate the road that city just re-paved if they don't fix it soon. 2. People are resorting to driving on the other side of the road to avoid the holes, including school buses. This is not a safe situation. Again, I would have thought they would come back and finished it quickly but it's been many weeks and I am starting to be concerned. Thanks.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 51 days have already passed.
Milling and repaving this section of roadway will start tomorrow 7/8/26 and be expected to wrap up next week.
Hello Jay, thank you for the report. I just reminded Centerpoint Energy's subcontractor who performed the work about the needed restoration and asked for a timeline for repair. I'll add an additional comment clarifying that timing before closing this report.
| City | Bloomington |
|---|---|
| State | IN |
| Zip | 47404 |
| Latitude | 39.206497192383 |
| Longitude | -86.547401428223 |
| Township | Bloomington |
| Status | Case Date | Category | |
|---|---|---|---|
| closed | 5/28/1998 | Excessive Growth | |
| closed | 6/14/1996 | Sidewalk Snow Removal | |
| closed | 10/6/1995 | Sidewalk Snow Removal |