closed #202274
Traffic Signals
275 E Winslow RD
- Case Date:
- 4/25/2025
Light regularly does not change to green for traffic going south even with multiple cars sitting it will cycle through multiple times unless someone needs to turn left.
Light regularly does not change to green for traffic going south even with multiple cars sitting it will cycle through multiple times unless someone needs to turn left.
A constituent called in today and asked that we revisit the sidewalk work that was done at 11th and Lindberg. He stated that this sidewalk was not repaired to be accessible per ADA standards. He has seen multiple wheelchair bound residents struggle crossing here.
The pavement in front of our driveway seems to be sinking, which has now resulted in a large height difference between the asphalt and the concrete gutter/curb. Would it be possible to repair the sinking asphalt?
AT&T Tower behind my home has been making a consistent extremely loud noise for the past 3 days.
There is a pothole at the end of the driveway at 3805 S Woods Edge Bend. Could you please fill it? Thank you!
We are located currently in a home in Hyde Park that's close to a cell tower, and the cell tower is already a little bit concerning for me. So that's 1 area of questions I have. The second is, though, that as of this morning, it's emitting a high pitched frequency all day long. Nonstop. It's creating headaches for us and our family. I believe the cul-de-sac neighbors as well. I'd like to get it stopped as soon as possible. Can you please direct me in so doing? Thank you so much.
Street light neck broken.
Over the past 4 years, W. 1st street from Walker to edge of Hopewell (near Fairview) was used extensively, often daily, during demolition and construction with heavy equipment and trucks often idling there waiting to move closer to the Hopewell construction area. . As a result that end of the street as well as the curve onto Wylie/Euclid street experienced a lot of wear and tear; periodic potholes, sidewalks closed at times, spray painted utility markings. Are there any plans to pave and repair the street and shoulders that are technically in McDoel Gardens? It definitely would show a measure of goodwill for all that the near neighbors and businesses have experienced as Hopewell emerges. W. 1st towards Rogers and onward looks great with paving, new sidewalks and street lamps.
Other: Over the past 4 years, W. 1st street from Walker to edge of Hopewell (near Fairview) was used extensively, often daily, during demolition and construction with heavy equipment and trucks often idling there waiting to move closer to the Hopewell construction area. . As a result that end of the street as well as the curve onto Wylie/Euclid street experienced a lot of wear and tear; periodic potholes, sidewalks closed at times, spray painted utility markings. Are there any plans to pave and repair the street and shoulders that are technically in McDoel Gardens? It definitely would show a measure of goodwill for all that the near neighbors and businesses have experienced as Hopewell emerges. W. 1st towards Rogers and onward looks great with paving, new sidewalks and street lamps.
Very deep pothole near the sewer opening on the north side of Maxwell Lane, about a block west of High Street.