City Construction Projects
304 S Rogers ST
- Case Date:
- 8/28/1997
After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed.
See letter
City Construction Projects
1103 N Woodburn AVE
- Case Date:
- 1/22/2003
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
Excessive Growth
419 N Walnut ST
- Case Date:
- 1/1/1995
Mr. Ross feels that the use of the parking lot to the south of their building for construction equipment and debris storage is illegal dumping and violation of city codes and ordinances. You can contact their general manager Jack Lewis at 332-0402 for more info.
Excessive Growth
211 E 15th ST
- Case Date:
- 8/8/2011
The alley behind 211 E. 15th Street is over-grown. A letter and pictures was also received via mail.
Excessive Growth
426 E 6th ST
- Case Date:
- 1/28/1998
letter from David saying trash is building up here.
Excessive Growth
310 N Dunn ST
- Case Date:
- 1/28/1998
Letter from David saying trash is building up at this location.
Excessive Growth
414 E 9th ST
- Case Date:
- 2/2/1998
south side between dunn and Grant low hanging branches which interfere with dedestrians, expecially in snow or rainy weather
Excessive Growth
4401 E Cambridge CT
- Case Date:
- 7/30/2003
Weeds 6 feet tall at the northwest corner of the property.
Excessive Growth
2310 W 3rd ST
- Case Date:
- 6/4/2010
overgrown weeds and trash, animal infestation
Excessive Growth
3417 E 3rd ST
- Case Date:
- 7/7/2009
High grass and weeds