closed #165508
City Construction Projects
900 S Larkspur LN
- Case Date:
- 8/15/2018
Have had a basketball goal knocked over on sidewalk for couple weeks now
Have had a basketball goal knocked over on sidewalk for couple weeks now
Cylinder electric box smashed over on ground next to street light
The pavement at the gutter/curb/catch basin in front of my home, 1914 Hackberry Rd, has failed and there is a 12"x12" hole at the catch basin. I am surmising that the connection has failed and has washed out under the pavement. Could you have someone check it out for us. Thanks, john
Mayo has installed a new post ( pole ) on my property at the corner of Brownridge and Fieldcrest in Hoosier acres. They did extensive digging around the area and were supposed to reseed, since I had my lawn completely reseeded this last fall. This has not been done and there is a muddy mess at the corner. Moreover holes were made at various places on the lawn and these were never filled in. This is a hazard in mowing or just walking on the lawn. If someone catches there foot in the hole it could result in a broken leg or twisted ankle. Mayo or the city would then be responsible. There are little flags all over the lawn, which needs to be mowed. Should I just remove these ?. Is the work completed ? On the pole there is a street lamp to replace the one currently at the corner, but neither is working, which is another hazard. The ditch in the area has also collapsed. I believe it is Zayos obligation to fix this, or someone ( the city of Bloomington ) should. Milton Taylor 3712 Brownridge Rd. 812-336-2095
I have two trees in the parkway outside me home that two years ago was painted with red paint to remove. To date they are still there and the largest on with a strong wind will fall across the tree, and it is infested with bugs as well. Can someone please take a look at them. Thanks.
You drove over countless potholes to install a bunch of new roadbumps! Congratulations, you just increased wear and tear and everyone's vehicles without making the roads any safer at all.
When road work done on 500 2nd street
Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?
Pavement in even, swerving cars due to pavement issues almost caused several accidents
What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark