Potholes, Other Street Repair
- Case Date:
- 8/14/2025
I had sent in a request on 5/19/25 Case #202787 reporting that Olive Street needs a concrete curb installed. Due to the excessive rainfall this has caused flooding issues for 1502 S. Olive and the house on the corner of Hillside and Olive (1144 E. Hillside Dr.). I was informed that this was on the paving list and there was plans for an asphalt curb. I called on 6/9/25 and spoke to the Engineering dept. (Iris) about installing a concrete curb instead of asphalt. There is already a partial concrete curb that runs past 1502. It needs to have a concrete curb all the way up the hill so that rain will not flood into the driveway and along the house of 1502, plus it runs past the curb into the yard of 1144 E. Hillside causing flooding in the basement. They have a sump pump now, but it's old and could quit at any time. It's already August and there hasn't been any kind of activity on this street. Do you have an estimated date as to when the street will be paved and the curb installed? Also, there is a construction sign in the yard of 1144 E. Hillside that has been there all summer and would like it to be moved. Thank you for any information you can provide!
Potholes, Other Street Repair
Corner of Arden Dr and Windsor Dr
- Case Date:
- 9/2/2025
Several potholes are continuing to get worse at this intersection. When turning onto Windsor Dr. from Arden, it is impossible to avoid these jokes without traveling into the opposite lane. Hank Duncan (City Bicycle Coordinator) told our subdivision last fall that the City would be redoing the streets during the Greenway project, but it has yet to be started. I left a voice mail for him 2 weeks ago, asking about the plan, but he has not responded. Please contact me.
Potholes, Other Street Repair
1808 E Windsor DR
- Case Date:
- 9/5/2025
Signs indicating that road construction is ahead have been here for months. No construction is taking place. These signs need to be removed. Leaving unnecessary warning signs up is irresponsible since it conditions people to ignore them.
Potholes, Other Street Repair
322 E Cottage Grove AVE
- Case Date:
- 9/4/2025
See case #204982. Response was dismissive. "..will be compliant when paving is completed..". *When* will that happen? This year? The areas surrounding the ramps are DANGEROUS, especially at Grant/Cottage Grove. Why start a project if it cannot be completed at the time?
Potholes, Other Street Repair
316 W 6th ST
- Case Date:
- 8/29/2025
Heading north from the intersection of 6th and Madison, the first turn in on the right where the asphalt meets the concrete is pitted and uneven. The issue was remedied previously and it was greatly appreciated. However, it has worn down over time again and is causing issues as we need a smooth surface to roll over. Any help filling this in and making the asphalt level with the concrete would be greatly appreciated. Please see my contact info for more details if the picture and description are insufficient. Thanks.
Potholes, Other Street Repair
405 N Rogers ST
- Case Date:
- 8/29/2025
Utility cut has sinking causing a dip
I can’t believe that with all the City vehicles that are in the area that this has to be reported.
Maybe the City should have a system for employees to report issues do the public doesn’t have to. This way it can be taken care of sooner.
Potholes, Other Street Repair
1977 N College Ave
- Case Date:
- 9/2/2025
A large pothole located at the intersection of N. College Avenue and W. Riley Drive in Bloomington, Indiana. The pothole is situated directly at the entrance to the Steak ’n Shake and Granite Apartments.
This pothole is significant in size and depth, creating a potential hazard for drivers entering or exiting the area. It poses a high risk of causing damage to vehicles, including tire blowouts, wheel damage, or suspension issues. Additionally, its location at a busy entrance increases the chances of accidents or traffic disruption.
I recommend that the pothole be inspected and repaired as soon as possible to prevent damage to vehicles and to maintain road safety in this high-traffic area.
Potholes, Other Street Repair
Huntington & Hillside
- Case Date:
- 9/9/2025
Very large pothole on Huntington near Hillside. Any cyclist running over it will likely result in falls and injuries.
Potholes, Other Street Repair
1808 E Windsor DR
- Case Date:
- 9/9/2025
Road construction signs have been here for months. No construction is happening. I received a response to my previous report that, "This project is not yet completed. The signs will be removed upon completion."
Whatever project this is has also not begun. The signs need to be removed until the project is actually ready to commence. Posting signs months in advance is irresponsible. When and if this mystery project ever starts, crews will be at higher risk because of the street division's poor planning. Everyone in this neighborhood is used to those signs being there for no reason, so they are useless as a safety measure.
Potholes, Other Street Repair
1400 N David Baker AVE
- Case Date:
- 9/10/2025
There is a large rock, probably 3 foot by 3 foot in the roadway by the sidewalk. Could not roll it into the grass, too heavy