closed #212809
Sidewalk Requests
1017 S Carleton CT
- Case Date:
- 8/3/2026
The sidewalks beside trees are raised or cracked in front of 3 houses along this side of Carleton Ct.
The sidewalks beside trees are raised or cracked in front of 3 houses along this side of Carleton Ct.
There is no sidewalk in front of 2942 and 2940 S Walnut St. Would be a great improvement to accessibility to connect the sidewalks on either side
Between S Rogers Street and the Clear Creek trail, there is no sidewalk. This is a short distance that crosses over Clear Creek. A sidewalk on either side of the bridge that extends from the west side of S Rogers Street to the trail would be great, safer for pedestrians to access the trail from this point.
There is no sidewalk to link the housing area (West Pointe Edition, Bloomington Apts, etc) to the business area (Buffalo Wild Wings, Subway, health complex. Many people will walk in the street but the road is covered and not lit so it can be dangerous for pedestrians. Especially at night.
Looking to see if a new sidewalk could be built between Adams street and Bloomfield Road. There are already sidewalks up to the intersection of Adams and Allen Street extending a little beyond (in front of the Bloom apartment complex). An extension of this sidewalk to Bloomfield road would connect all residents in this area to other sidewalks in Bloomington.
Dave Askins B Square covered the topic of grinding sidewalks as a less expensive oprion to pouring new concrete. Here's a suggestion: try to find why my ~30+sidewalk (806 S. Park Ave) is almost the only one that hasn't needed repair of any kind. The weak points are the seems at each end. Mine was done as part of the program that allowed residents to get on a waitlist and then pay only for materials (work done by the City I think). Part of the reason may be that the seams and the curbs seem to be just scored lines, i e. aesthetic rather than functional. Whatever the reason it might be worth finding out.
I would like to request cracked sidewalk sections to be repaired. Many thanks for your help with this.
There is sinking, cracked in half side walk concrete panel on southside of Moores Pike, just a little east of High Street.
With the announcement of the new park on 446/East Moore's, what are the citys plans to ensure safe and easy pedestrian and cycle access to the park? Currently, East Moores, 446, and Smith are not safe for either.
This branch just fell out of a tree onto the sidewalk like 3 seconds after my kid walked under it. I would like for people to maintain their trees and for my child to remain alive.