open #210894
Trails
4301 S Rogers ST
- Case Date:
- 5/21/2026
Recent rains moved more trees down to the pedestrian bridge over Clear Creek on the new BRT spur. This is not a repeat of an earlier report.
Recent rains moved more trees down to the pedestrian bridge over Clear Creek on the new BRT spur. This is not a repeat of an earlier report.
Hi, I requested the removal of a tree near my house and was hoping for an update, that was ticket #203710. Thanks!!
During farmers market weekends, the B Line trail often gets blocked by people forming a line across the trail (red line drawn on photo), instead of sticking along parallel to direction of travel on the trail to the side (pink line drawn on photo). I would like to ask if the city could work with Le Petit Cafe to create a barrier with signage, perhaps out of traffic cones (white dots drawn on photo), on the weekends in order to facilitate a line forming in a way that keeps the B Line trail accessible.
On the northwest side of 2nd & Walker, the construction work has cut a massive opening in the multi-use path. The asphalt is gone across the entire width of the trail, and there is a probably 5-8 inch deep abyss that is very dangerous on a bike, and would certainly be challenging for anyone walking or in a wheelchair trying to get through there safely. Can this be addressed?
The mowing crew continues to blow debris onto my property from the b-link trail and they are mowing my property that has already been mowed. I've stopped them in the past and they had attitude when I asked them to blow up the hard surfaces. Please have them return and blow off all the clippings and tell them to do it the other direction, which seems to be common sense, going forward. Thank you. ~Lori @ Choice Realty