- Case Date:
- 5/23/2022
The tulip poplar planted along the S High St recreational path last autumn is showing no signs of life this spring. All of the other tulip poplars in the area are now fully leafed out. This is the last tree in the row that includes the yellowwoods north of Wimbleton St. Would love for it to be replaced this year. Thanks.
- Case Date:
- 11/7/2021
This tension wire is a hazard for cyclists and needs to be well lit for better visibility in the dark. Reflectors on the wire and along the bend in the path would also add to the safety. I am a 7th grade student at Jackson Creek Middle School. I ride my bike to school every day on the High St recreational path at around 7:30 am. It is dark at that time and I use lights on my bike. On Friday, Nov 5, I was biking down the hill towards this spot. I was going fast down this hill to have enough speed for the uphill right past this spot. Unfortunately, even with my bike light, the tension wire and the sudden bend in the path is hard to see in the dark. My shoulder hit the tension wire and knocked me off my bike. My bike had minor damage to the seat.
- Case Date:
- 10/20/2026
New asphalt on top of construction is not level with the original B-line trail. This uneven patch-job is located at 2nd and S Morton. It causes imbalance for cyclists and pedestrians at a dangerous intersection.
- Case Date:
- 8/17/2021
This recently completed trail along Rogers running towards the new path on High street is in need of some maintenance along the bridge area. There are 2 ADA issues that need to be addressed:
1. Encroaching vegetation has significantly narrowed the pathway making wheelchair travel difficult.
2. Encroaching vegetation has completely covered and made the handrail inaccessible.
Can the vegetation here please be trimmed back to rectify these issues? Thanks!
- Case Date:
- 4/9/2026
The B-Line Trail crossing at 2nd Street needs attention. There are potholes, missing bricks, and problems of that nature throughout the crosswalk and the sidewalks on either side that are dangerous. The ground is uneven. Can these issues be looked at and fixed to make it safer for pedestrians and cyclists?
- Case Date:
- 10/3/2026
There's about a 4-5 foot near-shear dropoff from the b-line trail to the new culvert right here.
Trails
3020 S Stratford DR
- Case Date:
- 9/16/2025
New steps were installed roughly two months ago at this Goat Farm turn. There is construction material debris that has remained here since, however. Please finalize this nice project with the removal of the unnecessary materials. Thank you!
- Case Date:
- 6/28/2025
When will the B-Line trail be finished between Adams Street and Fountain Drive? There has been no activity or progress on this "missing link" since 2024. What is the hold-up or reason for delay? Please provide a timeline for completion of this last section. Thank you.
- Case Date:
- 8/23/2026
On the northwest side of 2nd & Walker, the construction work has cut a massive opening in the multi-use path. The asphalt is gone across the entire width of the trail, and there is a probably 5-8 inch deep abyss that is very dangerous on a bike, and would certainly be challenging for anyone walking or in a wheelchair trying to get through there safely. Can this be addressed?
- Case Date:
- 7/11/2025
This bush needs trimmed