Potholes, Other Street Repair
1919 N Dunn ST
- Case Date:
- 3/24/2026
This pothole takes up over half of the lane in the lane headed towards the bypass. You can't miss it unless you swerve into the other lane, and then there's another one that's smaller but really deep right after it (if you could also fill that one that would be amazing). It looks like someone took a circle the size of a hoola hop (or larger) out of the pavement. There have been some close calls where people have tried to swerve around it into oncoming traffic and almost crashed.
Potholes, Other Street Repair
508 N Washington ST
- Case Date:
- 3/24/2026
The asphalt is largely missing in one part of the alley that runs between 508 and 514 N Washington Street (alleyway from Washington to Lincoln). The dangerous section is next to the garage for 508 N Washington, where the road is steeply inclined and the asphalt on the south side is broken up and washed away.
Potholes, Other Street Repair
424 N Washington ST
- Case Date:
- 3/21/2026
Several spots between 10th st and 7th street have pot holes.
Potholes, Other Street Repair
608 W 4th ST
- Case Date:
- 3/19/2026
Potholes on 4th st in front of my house and in the block towards Roger’s.
Potholes, Other Street Repair
1208 W 7th St
- Case Date:
- 3/19/2026
Pothole by traffic roundabout
Potholes, Other Street Repair
2110 N Walnut ST
- Case Date:
- 3/18/2026
The entire stretch of road from 10th and N walnut, up until you turn onto to 45
Potholes, Other Street Repair
220 E 3rd St
- Case Date:
- 3/18/2026
Pot holes right at the entrance to BPD employee parking off of Washington St
Potholes, Other Street Repair
2607 E 10th St
- Case Date:
- 3/17/2026
10th street from the bypass to Union St is in awful shape. the road just west of the railroad underpass is almost possible to avoid at this point. The bad spots need more than patching. Thank you for your time. Jennifer Barron
Potholes, Other Street Repair
2369 N Browncliff LN
- Case Date:
- 3/14/2026
Culvert repair began in November 2025. Since that was finished and a temporary patch made, there has been no further paving. As a result, a 30 yard long stretch of Browncliff, at the bottom of a small hill, is crumbling, full of potholes, and has a big dip where the culvert was reconstructed. Please get to this soon, while there is still a bit of pavement left.
Potholes, Other Street Repair
235 S Pete Ellis DR
- Case Date:
- 3/13/2026
Deep pothole northbound lane