City Construction Projects
916 N Lindbergh DR
- Case Date:
- 7/19/2025
The courtyard at the 900 block of North Lindbergh drive has always flooded. The situation may have just been exacerbated even after construction is complete unless proper drainage is included before concrete is poured. I also don't really want motorcycles and motor scooters revving up all hours of the day and night outside of my apartment, and hope that this will only be for bicycles and non-motored vehicles. We now have what may become a huge mosquito breeding pool in our front yard.
City Construction Projects
916 N Lindbergh DR
- Case Date:
- 7/20/2025
I was told by Rhonda at Bloomington housing authority that the construction project taking place in our courtyard on Lindbergh will be a covered structure for bicycle parking. My concern is if motorized vehicles like scooters and motorcycles park there, the c shape created by the three tall apartment buildings surrounding the courtyard already create an amphitheater that echoes every sound. The noise from bikes that people built themselves around here are loud enough, but if they're revving them up in our courtyard and if there's an awning, and we're in this low level across the street from a hill, please consider how loud this will be in our apartments where there's gaps around our front door. I work full-time and need my sleep at night and to rest on the weekends. There are small children living here who need to be in bed at night. Please consider including signs that there will be no motorcycles or motor scooters parking here. I think bicycle parking is wonderful and I am enthusiastic about having bicycle parking. In a previous report, I mentioned the issue that has already been present of flooding before this construction began, and tomorrow, there is a flash flood warning for all of Central Indiana.
City Construction Projects
823 W 8th ST
- Case Date:
- 10/24/2024
AEG was working again in our tree plot yesterday. The storm drain just west of our house, at the alley, is caked with mud and trash. This is the third time they have dug in this plot and the third time they have left a mess. We aren’t cleaning it up this time.
City Construction Projects
810 N Blair AVE
- Case Date:
- 8/7/2025
The city did a storm drain project last week and left a large bag of conrete waste on the sidewalk. They removed signage related to construction. People use electric wheelchairs, strollers, carts, etc. often on Blair, but now they can't on the east side of the street, and there's no signage to warn people to cross the sidewalk before the obstacle. It's been like this all week - is it possible for the city to remove the (very heavy!) bag of waste concrete?
City Construction Projects
806 W 4th ST
- Case Date:
- 6/20/2011
The sidewalks in front of 806 & 810 W. 4th Street are in very poor condition. They are crumbling and cracked. They are hazardous to walk across and need to be replaced.
City Construction Projects
720 W 7th ST
- Case Date:
- 9/9/2019
I may have sent this to the wrong department earlier today. Cars are parking regularly in front of the hydrant on the North East corner of Maple Street at West 7th. Can you please come and repaint the curb? You guys did a great job repainting the curbs on W 7th but the curbs on Maple need it too. Thanks.
City Construction Projects
709 N Keystone CT
- Case Date:
- 11/30/2022
please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.
City Construction Projects
615 N Adams ST
- Case Date:
- 5/15/1997
8TH & ADAMS STREET REDEVELOPMENT PROJECT: HALL STATES THAT THE SIDEWALK IS SPALDING VERY BADLY. HE WOULD LIKE TO HAVE SOMEONE FROM THE CITY COME AND WALK THE SITE WITH HIM. HALL STATES THAT THIS IS "THE WORST JOB HE HAS EVER SEEN".
City Construction Projects
613 E 12th ST
- Case Date:
- 8/18/2024
Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?
City Construction Projects
600 W 6th ST
- Case Date:
- 9/12/2019
I feel like the city should know that I broke my foot walking down the horrible Near West Side sidewalk last week.