City Construction Projects
2012 E Hillside DR
- Case Date:
- 5/27/2025
The construction contractor has placed the Road Closed barricades in two of the three lanes on High St. at the Hillside intersection. This is impeding the flow of traffic and is going to cause an accident. Once three cars fill the left turn lane, High St. is effectively blocked to North/South travel. There is now only more traffic going North on High St. with the roundabout closure.
Please have the barricades removed or placed to the sides of the road. If someone cannot read the road closure signage properly, they will have to pay the price once they reach the closed roundabout.
City Construction Projects
2012 E Hillside DR
- Case Date:
- 5/27/2025
Since Roger Street is closed, all people who live off of high Street have to take high Street up to Morse Pike/Hillside. With these signs now up on both sides, it is down to one lane for no reason. There's no reason to have the northbound traffic on high Street blocked.
City Construction Projects
- Case Date:
- 8/5/2020
Pot hole on Rogers road by Sherwood oaks church - dangerous! People are damaging their vehicles. Needs immediate action!
City Construction Projects
1005 S Covenanter DR
- Case Date:
- 8/11/2020
The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn
City Construction Projects
2638 S Isabel CT
- Case Date:
- 8/13/2020
Overgrown tree is dangerously close to our house. Its root system is damaging our driveway, is intertwined with our electrical boxes, and have roots hitting our house. We are requesting the removal of the tree and roots and the replanting of a new one. Please advise as we want to ensure that the overgrowth doesn't overlap with the winter months. There are better pictures, however, I can only upload 1 of them. Thank you.
City Construction Projects
S Sare Rd & E Creeks Edge Dr
- Case Date:
- 11/6/2024
Orange cone left out near sidewalk
City Construction Projects
1202 e 1st st and 1208 1st st
- Case Date:
- 11/6/2024
There is a hole at the curb at the end our adjoining driveways, 1202 and 1208 E 1st. This has developed after the attempted temporary fix which was made after attempting to find the source of a water leak. This was made during the installation of Gigabit now. It is 17 inches deep and when covered with leaves, not visible. Please fix this to prevent damage to our cars.
City Construction Projects
822 S Fess Ave
- Case Date:
- 11/6/2024
822 S Fess again. The gigabit people are at it again. End of driveway and into neighbor. Left a hole and trash, plastic debris and empty water bottle. Just abandoned with a hole by neighbors tree at end of drive way. Please get these people under control. So they have left this as if they started digging, changed their mind and left. Then they dug up my front yard and then on Monday, a water main rupture from their digging. ALL other installation has been down the alley WHERE the power lines run. Please respond. Issue #3.