City Construction Projects
901 W 1st ST
- Case Date:
- 6/30/2025
Cable hanging down on sidewalk near corner of W. 1st and WylieEuclid. Duke came and said not theirs prob phone or internet cable. Checked with one internet company (Comcast) and 14 day wait. The cable is on the sidewalk and a hazard in many ways. It seems to be possible related to the movement and placement of construction poles during demos and renovations to the East.
City Construction Projects
904 S Rose AVE
- Case Date:
- 12/18/1997
MOUND OF DIRT LEFT IN YARD , WOULD LIKE YARD REPAIRED
City Construction Projects
916 N Lindbergh DR
- Case Date:
- 7/19/2025
The courtyard at the 900 block of North Lindbergh drive has always flooded. The situation may have just been exacerbated even after construction is complete unless proper drainage is included before concrete is poured. I also don't really want motorcycles and motor scooters revving up all hours of the day and night outside of my apartment, and hope that this will only be for bicycles and non-motored vehicles. We now have what may become a huge mosquito breeding pool in our front yard.
City Construction Projects
916 N Lindbergh DR
- Case Date:
- 7/20/2025
I was told by Rhonda at Bloomington housing authority that the construction project taking place in our courtyard on Lindbergh will be a covered structure for bicycle parking. My concern is if motorized vehicles like scooters and motorcycles park there, the c shape created by the three tall apartment buildings surrounding the courtyard already create an amphitheater that echoes every sound. The noise from bikes that people built themselves around here are loud enough, but if they're revving them up in our courtyard and if there's an awning, and we're in this low level across the street from a hill, please consider how loud this will be in our apartments where there's gaps around our front door. I work full-time and need my sleep at night and to rest on the weekends. There are small children living here who need to be in bed at night. Please consider including signs that there will be no motorcycles or motor scooters parking here. I think bicycle parking is wonderful and I am enthusiastic about having bicycle parking. In a previous report, I mentioned the issue that has already been present of flooding before this construction began, and tomorrow, there is a flash flood warning for all of Central Indiana.
City Construction Projects
925 E Atwater AVE
- Case Date:
- 8/13/2022
East 914 Atwater utility cut needs filled in
City Construction Projects
925 S Ballantine RD
- Case Date:
- 10/22/1998
The residents at 925 S. Ballantine had a contractor make a street cut across Ballantine. The cut is sinking in and has become dangerous.
City Construction Projects
939 S High ST
- Case Date:
- 12/15/2020
Tree limbs growing into and touching public utility lines. Several trees have not been pruned.
City Construction Projects
Bloomington City Hall
- Case Date:
- 7/19/2020
Continual speeders on E Morningside. Someone told me our neighborhood association requested traffic calming. Please do something to keep it from being a drag strip. Definitely open to whatever you think best but multiple of us have complained for some time without changes. Thank you for your good work.
City Construction Projects
Bloomington City Hall, 401 N Morton St, Bloomington, IN 47401, USA
- Case Date:
- 2/27/2024
At the corner of 3rd and Clarizz. Sitting at the light heading west and turning south onto Clarizz the concrete barrier sticks out in a manner that is not very visible at night. I blew a tire hitting the concrete bicycle median. I hope this makes sense. Than you.
City Construction Projects
Bloomington Hospital Heliport, 2651 E Discovery Pkwy, Bloomington, IN 47408, USA
- Case Date:
- 2/19/2024
Why there road work at new hospital