City Construction Projects
3945 S Cramer CIR
- Case Date:
- 8/31/2025
New road height is significantly below curb edge (over two inches) along all of newly finished roadway on Fullerton Pike and new roundaboat but is hazard for drivers and cyclists entering and leaving Southwest public library branch. This is a very rough transition for cyclists and could cause issues as cyclists will be turning in or out while also ascending or descending over this sharp edge between surfaces.
City Construction Projects
1333 N Washington ST
- Case Date:
- 8/27/2025
Construction is very loud. It starts at 6:30am and even 6am making it very hard to sleep. There are lots of diggers, and drills which are very loud and even making the house rumble. All the residents in my block face this issue.
City Construction Projects
212 E 17th ST
- Case Date:
- 8/14/2025
There are metal plates on the road that shift every time you drive over them. The shift was so bad that I could feel my car pull in a different direction while going over them.
City Construction Projects
916 N Lindbergh DR
- Case Date:
- 7/19/2025
The courtyard at the 900 block of North Lindbergh drive has always flooded. The situation may have just been exacerbated even after construction is complete unless proper drainage is included before concrete is poured. I also don't really want motorcycles and motor scooters revving up all hours of the day and night outside of my apartment, and hope that this will only be for bicycles and non-motored vehicles. We now have what may become a huge mosquito breeding pool in our front yard.
City Construction Projects
2600 S Rogers ST
- Case Date:
- 7/16/2025
Wondering if you could tell me what the utility digging in the 2600 block of South Rogers is for. They are unmarked trucks and we received no notice of work in the area. Holes in several yards.
City Construction Projects
Liberty Dr
- Case Date:
- 7/14/2025
when liberty dr by aidi roadwork be done
City Construction Projects
Liberty Dr
- Case Date:
- 7/11/2025
Why they doing road work on liberty drive
City Construction Projects
901 W 1st ST
- Case Date:
- 6/30/2025
Cable hanging down on sidewalk near corner of W. 1st and WylieEuclid. Duke came and said not theirs prob phone or internet cable. Checked with one internet company (Comcast) and 14 day wait. The cable is on the sidewalk and a hazard in many ways. It seems to be possible related to the movement and placement of construction poles during demos and renovations to the East.
City Construction Projects
2012 E Hillside DR
- Case Date:
- 5/27/2025
Since Roger Street is closed, all people who live off of high Street have to take high Street up to Morse Pike/Hillside. With these signs now up on both sides, it is down to one lane for no reason. There's no reason to have the northbound traffic on high Street blocked.
City Construction Projects
2012 E Hillside DR
- Case Date:
- 5/27/2025
The construction contractor has placed the Road Closed barricades in two of the three lanes on High St. at the Hillside intersection. This is impeding the flow of traffic and is going to cause an accident. Once three cars fill the left turn lane, High St. is effectively blocked to North/South travel. There is now only more traffic going North on High St. with the roundabout closure.
Please have the barricades removed or placed to the sides of the road. If someone cannot read the road closure signage properly, they will have to pay the price once they reach the closed roundabout.