City Construction Projects
620 W Howe ST
- Case Date:
- 8/7/2025
Resident has requested installation of speed bumps along W Howe St to control traffic driving parallel to Building Trades Park. They have personally observed residents travelling at high speeds while children were playing in the area.
City Construction Projects
300 E Smith AVE
- Case Date:
- 8/4/2022
A contractor (possibly PCT?) installing a utility pole at NW corner of Lincoln and Smith is blocking the alley and blocking parking on private property.
City Construction Projects
- Case Date:
- 12/14/2021
Mike Morris (917-538-5927) called about a tree that fell on the multi-use path handrail on Rogers, just east of High. He mentioned it happened months ago and wanted to know when it will be repaired.
City Construction Projects
W Marquis DR
- Case Date:
- 8/26/2020
Caller said that semi's are taking w 17th to N Lismore Dr to W Marquis Dr. They are getting stuck and running over curbs. Also getting stuck and N Crescent Rd onto Fountain. Wants to know why they are routing them that way.
City Construction Projects
- Case Date:
- 7/12/2016
Citizen called, wanted to stay anonymous, reporting dangerous behavior by road crew working on Old 46. Drove toward her in her lane, head-on.
City Construction Projects
425 E KIRKWOOD AVE
- Case Date:
- 8/11/1997
Citizen is manager of Jiffy Treet. Says sidewalk in front of business is very bad and several older people have almost tripped. Did not realize property owner is responsible....he rents from Claire Young, 812-597-5711. JA told him we'd have Street check it out (Tom Goldman).
City Construction Projects
409 E Southern DR
- Case Date:
- 8/26/1997
Ms. Costley owns the above rental property. Wants to know if the area between the street and lawn where recent work was done will be seeded and strawed. Utilities says this work was on storm sewers in conjunction with Hillside work.
City Construction Projects
401 N Morton ST
- Case Date:
- 9/5/1997
Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?
City Construction Projects
S COLLEGE AVE
- Case Date:
- 9/8/1997
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.
City Construction Projects
S COLLEGE AVE
- Case Date:
- 9/8/1997
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.