City Construction Projects
- Case Date:
- 10/1/2025
The current construction project on 2nd street is extremely disruptive and causes the building to shake. For necessary/emergency daytime construction this is totally understandable, but the project on 2nd st (between Walnut/Rogers) has been doing construction only from late evening to overnight around 4-5am every day. I have not slept since the construction started a week ago and it is scheduled to continue another full week. Even if there is a permit to be exempt from the noise ordinance, please consider rescheduling this work to take place during daytime hours. As I said, the deeper digging affects the foundation of the building, causing very irritating vibrations that give me headaches and make sleep impossible. It has affected my work life and mental health to miss so much sleep. My window faces the road and this has been an absolute nightmare of a time for me.
City Construction Projects
1316 N Lincoln ST
- Case Date:
- 9/20/2025
Late construction in the middle of the week. Sometimes between the hours 12am-5am.
City Construction Projects
1300 N Lincoln ST
- Case Date:
- 9/20/2025
I’m not sure what the rules of construction activity that is permissible, but I would assume that blocking private driveways and working in a residential neighborhood at 3AM is not allowed. My son and his roommates are seeing construction workers using their private yard to eat lunch and even order food to their address. This is absolutely unacceptable and do not believe it’s allowed by law to work a construction site, pouring concrete, etc. in the middle of the night in a residential neighborhood.
City Construction Projects
1355 N Lincoln ST
- Case Date:
- 9/20/2025
Construction continues to obstruct private driveway of my son’s rental. They are placing cones and blockades well onto their private drive. Additionally they are pouring concrete and making noise at 3-4 AM waking residents and renters. Not acceptable!!!!!
City Construction Projects
Heather Dr. front entrance to Peppergrass north side of street.
- Case Date:
- 9/16/2025
There are 2 holes located in the grass area between the sidewalk and Heather on the north side of the street. I would like them to be filled in for safety. Both are before you get to Laurel Ct.
Thank you,
Kaye Beavers, Peppergrass HOA, landscaping
City Construction Projects
1510 S Rogers St
- Case Date:
- 9/6/2025
laying in the grass opposite the kitchen by some utility boxes there's a construction sign that has been forgotten
City Construction Projects
1200 E Hillside DR
- Case Date:
- 9/2/2025
Hello-
There were street crew south of here earlier this morning and when I got home this evening there's a cable down from a pole and it is across my driveway and in my yard.
It looks like a communication line, but I'd rather not mess with it.
thanks
City Construction Projects
3945 S Cramer CIR
- Case Date:
- 8/31/2025
New road height is significantly below curb edge (over two inches) along all of newly finished roadway on Fullerton Pike and new roundaboat but is hazard for drivers and cyclists entering and leaving Southwest public library branch. This is a very rough transition for cyclists and could cause issues as cyclists will be turning in or out while also ascending or descending over this sharp edge between surfaces.
City Construction Projects
1333 N Washington ST
- Case Date:
- 8/27/2025
Construction is very loud. It starts at 6:30am and even 6am making it very hard to sleep. There are lots of diggers, and drills which are very loud and even making the house rumble. All the residents in my block face this issue.
City Construction Projects
212 E 17th ST
- Case Date:
- 8/14/2025
There are metal plates on the road that shift every time you drive over them. The shift was so bad that I could feel my car pull in a different direction while going over them.