Roll off dumpster in the middle of the street on the side that says no parking coming up the hill
Roll off dumpster in the middle of the street on the side that says no parking coming up the hill
Somebody's put a roll-off dumpster on the side of the street that's no parking I should come up the hill no cones no nothing I've almost hit it My neighbors almost hit it
Somebody's put a roll-off dumpster on the side of the street that's no parking I should come up the hill no cones no nothing I've almost hit it My neighbors almost hit it
on Rogers/Madison, where it changes name and crosses over the railroad tracks just north of 11th street, the bike lane is on the uphill side of the street. so at the apex, it switches from one side of the street to the other. at this switching point, we have lost our 'dashed line' merge zones. i am hoping that someone from Engineering will go look at the facts on the ground and validate its correctness. when it was conceptually designed back in 2011, i thought "gee they're gonna have to do a good job of signing that if it's not going to be a nightmare for cyclists to merge into traffic". and then when it was *finally* implemented around 2017-2019, it was just striped lines indicating that there is a merge. but when the bridge was re-decked in 2020-2021, they repainted it wrong. and subsequent generations of painting have each made it worse, to where the southbound merge zone is completely missing and cyclists are directed to stay in the abruptly-ending bike lane on the dangerous high speed downhill segment. and the northbound merge zone has been reduced to about 30 feet, again, at the wrong place for the merge.
sidewalk on west side of college ave, about 300ft south of 3rd street. this barricade was in place on july 1, 8, 15, and 22. this photo is from july 22. see ureport 203907. on july 22, after taking this photo, i moved the barricade into the adjacent parking space. i'm not sure what it looks like today (july 24). it seems like Duke never re-opened the sidewalk when they finished their work?? is that why they were allowed to close it for 3 straight weeks? thanks! - Greg
One of the baracades from the new convention center build (in the back of our Music academy) was placed in a way where it is blocking access to one of our parking spaces. It seems to be placed outside of the gate that they erected and not on their property. It would be great if you could have them move it over so that we can access are parking. Also, there is a lot asphalt debris being left on our property as well from digging around that area.
The contractor doing underground work (fiber?) left a bunch of loose soil along the west side of Walnut St Pike. They came back and seeded and strawed some mother areas but not this.
The side walk going towards 2nd street on Allen the trees r grown covering the sidewalk making it unable to see while walking ur dog at night thought maybe it could use some weed whacking and tree trimming
Plant overgrowth obstructing sidewalk