uReport

City of Bloomington, Indiana

closed: Submission Received #214111

Traffic Signals:

Other: No green light for left turn lane from S Rogers St onto S Patterson Dr. Traffic is getting backed up.

Assigned to
John Garzee
Problem Type
Signal is Malfunctioning

History

9/15/2026 13:25:41 Closed by John Garzee

Thank you for reaching out. We currently have construction occurring at this intersection, and some travel lanes will be blocked at different times over the next few weeks. To keep traffic moving as well as possible during construction, we have temporarily removed the protected left-turn phase. At times, through traffic also needs to use the left-turn lane because of the lane closures. If the signal continues serving a separate left-turn phase during those conditions, it can give green time to traffic that is actually waiting to go straight, which can create even longer backups on Rogers. It is not an ideal situation, but this temporary operation is intended to minimize overall delay while the construction is underway. We appreciate everyone's patience and encourage using an alternate route if desired. The work is expected to be completed in about two weeks. The project includes curb ramp and truck apron improvements along the Patterson, Grimes, and Rogers corridors to improve accessibility and bring these intersections closer to current standards.

Sent notification to John Garzee
https://bloomington.in.gov/crm/tickets/view?ticket_id=214111 Closed by John Garzee Thank you for reaching out. We currently have construction occurring at this intersection, and some travel lanes will be blocked at different times over the next few weeks. To keep traffic moving as well as possible during construction, we have temporarily removed the protected left-turn phase. At times, through traffic also needs to use the left-turn lane because of the lane closures. If the signal continues serving a separate left-turn phase during those conditions, it can give green time to traffic that is actually waiting to go straight, which can create even longer backups on Rogers. It is not an ideal situation, but this temporary operation is intended to minimize overall delay while the construction is underway. We appreciate everyone's patience and encourage using an alternate route if desired. The work is expected to be completed in about two weeks. The project includes curb ramp and truck apron improvements along the Patterson, Grimes, and Rogers corridors to improve accessibility and bring these intersections closer to current standards.

9/15/2026 07:08:57 Freddie Love assigned this case to John Garzee

It seems the this traffic movement has been omitted in the timing plans.

Sent notification to John Garzee
https://bloomington.in.gov/crm/tickets/view?ticket_id=214111 Freddie Love assigned this case to John Garzee You can use the link to follow progress on this case. It seems the this traffic movement has been omitted in the timing plans.

9/14/2026 16:22:59 Anonymous assigned this case to Cheyenne Bowlen

Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=214111 Anonymous assigned this case to Cheyenne Bowlen You can use the link to follow progress on this case.

9/14/2026 16:22:59 Opened by Anonymous

Rogers & Patterson

CityBloomington
StateIN
Latitude39.15376663208
Longitude-86.538749694824

Other cases for this location

StatusCase DateCategory
open10/14/2026Street & Traffic Signs
closed9/22/2026Traffic Signals
closed9/21/2026Traffic Signals
closed9/20/2026Traffic Signals
closed8/12/2026Street & Traffic Signs
closed4/13/2026Traffic Signals
closed3/9/2026Potholes, Other Street Repair
closed2/20/2026Nuisance Lights
closed2/20/2026Traffic Signals
closed10/28/2025City Performance
closed10/7/2025Blocked Street
closed5/15/2025Potholes, Other Street Repair
closed1/25/2025Potholes, Other Street Repair
closed1/16/2025Traffic Related Complaints