9/15/2026 13:25:41 Closed by John Garzee
Thank you for reaching out. We currently have construction occurring at this intersection, and some travel lanes will be blocked at different times over the next few weeks.
To keep traffic moving as well as possible during construction, we have temporarily removed the protected left-turn phase. At times, through traffic also needs to use the left-turn lane because of the lane closures. If the signal continues serving a separate left-turn phase during those conditions, it can give green time to traffic that is actually waiting to go straight, which can create even longer backups on Rogers.
It is not an ideal situation, but this temporary operation is intended to minimize overall delay while the construction is underway. We appreciate everyone's patience and encourage using an alternate route if desired. The work is expected to be completed in about two weeks. The project includes curb ramp and truck apron improvements along the Patterson, Grimes, and Rogers corridors to improve accessibility and bring these intersections closer to current standards.
Sent notification to John Garzee
https://bloomington.in.gov/crm/tickets/view?ticket_id=214111
Closed by John Garzee
Thank you for reaching out. We currently have construction occurring at this intersection, and some travel lanes will be blocked at different times over the next few weeks.
To keep traffic moving as well as possible during construction, we have temporarily removed the protected left-turn phase. At times, through traffic also needs to use the left-turn lane because of the lane closures. If the signal continues serving a separate left-turn phase during those conditions, it can give green time to traffic that is actually waiting to go straight, which can create even longer backups on Rogers.
It is not an ideal situation, but this temporary operation is intended to minimize overall delay while the construction is underway. We appreciate everyone's patience and encourage using an alternate route if desired. The work is expected to be completed in about two weeks. The project includes curb ramp and truck apron improvements along the Patterson, Grimes, and Rogers corridors to improve accessibility and bring these intersections closer to current standards.
9/15/2026 07:08:57 Freddie Love assigned this case to John Garzee
It seems the this traffic movement has been omitted in the timing plans.
Sent notification to John Garzee
https://bloomington.in.gov/crm/tickets/view?ticket_id=214111
Freddie Love assigned this case to John Garzee
You can use the link to follow progress on this case.
It seems the this traffic movement has been omitted in the timing plans.
9/14/2026 16:22:59 Anonymous assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=214111
Anonymous assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.