8/11/2026 09:12:02 Closed by Kendall Knoke
While the roadway has reopened to traffic, the project is still ongoing. The entire length of Grimes Lane will be resurfaced, and the asphalt near the new raised crosswalk will be reconfigured. We anticipate this work will be completed by the end of October. In the meantime, please use caution while traveling through the work zone and reduce speed.
Sent notification to Kendall Knoke
https://bloomington.in.gov/crm/tickets/view?ticket_id=212946
Closed by Kendall Knoke
While the roadway has reopened to traffic, the project is still ongoing. The entire length of Grimes Lane will be resurfaced, and the asphalt near the new raised crosswalk will be reconfigured. We anticipate this work will be completed by the end of October. In the meantime, please use caution while traveling through the work zone and reduce speed.
8/11/2026 07:04:03 Neil Kopper assigned this case to Kendall Knoke
Sent notification to Kendall Knoke
https://bloomington.in.gov/crm/tickets/view?ticket_id=212946
Neil Kopper assigned this case to Kendall Knoke
You can use the link to follow progress on this case.
8/11/2026 06:15:54 Cheyenne Bowlen assigned this case to Neil Kopper
Sent notification to Neil Kopper
https://bloomington.in.gov/crm/tickets/view?ticket_id=212946
Cheyenne Bowlen assigned this case to Neil Kopper
You can use the link to follow progress on this case.
8/7/2026 19:18:47 Anonymous assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=212946
Anonymous assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.