7/24/2026 14:56:10 Closed by Kyle Baugh
The cavity has been filled temporarily by the street division and a full repair of the core hole has been added as a high priority repair for the responsible contractor.
Other: Immediately north of the SE corner, there are two holes in the street crosswalk, both of them presenting danger for pedestrians. One is a rupture in the road. The other is a small "manhole" (the type for utilities) that is missing its cover. Please fix!
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
The cavity has been filled temporarily by the street division and a full repair of the core hole has been added as a high priority repair for the responsible contractor.
Photo added of M Street fiber path. They have been notified of the issue with a request to patch the core hole.
We are investigating this issue currently, but as you can see there is a pot hole where someone installed something. This may be because of bored line and it not being backfilled correctly. Can you check your records to see who and if someone drilled N/S through this intersection?
James, we have temporarily repaired this hole. See email from Danny Bitner.