7/14/2026 11:35:00 Closed by Zach Bell
I have received confirmation from Duke that they will be out to fix this, and I asked Duke if this kind of access will be needed in the future and I was told they would look into this. I will follow up again with Duke recommending protection of the right of way when access to this pole is needed.
Thank you.
Sent notification to Zach Bell
https://bloomington.in.gov/crm/tickets/view?ticket_id=212379
Closed by Zach Bell
I have received confirmation from Duke that they will be out to fix this, and I asked Duke if this kind of access will be needed in the future and I was told they would look into this. I will follow up again with Duke recommending protection of the right of way when access to this pole is needed.
Thank you.
7/14/2026 11:11:44 Kendall Knoke assigned this case to Zach Bell
Duke Energy needs to repair the damage and reseed the grass. When they access this location in the future, they need to use temporary measures to protect the ground surface to prevent this kind of damage. We wouldn't consider adding any impervious surface here for access unless it was truly a frequent access need, and even then it would need to be paid for and permitted by Duke.
Sent notification to Zach Bell
https://bloomington.in.gov/crm/tickets/view?ticket_id=212379
Kendall Knoke assigned this case to Zach Bell
You can use the link to follow progress on this case.
Duke Energy needs to repair the damage and reseed the grass. When they access this location in the future, they need to use temporary measures to protect the ground surface to prevent this kind of damage. We wouldn't consider adding any impervious surface here for access unless it was truly a frequent access need, and even then it would need to be paid for and permitted by Duke.
7/14/2026 08:26:28 Zach Bell assigned this case to Kendall Knoke
Kendall,
What do you think about the possibility of adding pavers or another solution if access to this pole will continue to be needed?
Thanks
Sent notification to Kendall Knoke
https://bloomington.in.gov/crm/tickets/view?ticket_id=212379
Zach Bell assigned this case to Kendall Knoke
You can use the link to follow progress on this case.
Kendall,
What do you think about the possibility of adding pavers or another solution if access to this pole will continue to be needed?
Thanks
7/14/2026 08:19:55 Zach Bell commented on this case.
Thank you for the suggestion and the update. I have reached out to duke for repairs again and will discuss the possibility of durability upgrades with one of the engineers.
Sent notification to Zach Bell
https://bloomington.in.gov/crm/tickets/view?ticket_id=212379
Zach Bell commented on this case.
Thank you for the suggestion and the update. I have reached out to duke for repairs again and will discuss the possibility of durability upgrades with one of the engineers.
7/14/2026 07:20:31 Cheyenne Bowlen assigned this case to Zach Bell
Sent notification to Zach Bell
https://bloomington.in.gov/crm/tickets/view?ticket_id=212379
Cheyenne Bowlen assigned this case to Zach Bell
You can use the link to follow progress on this case.
7/14/2026 07:02:46 Anonymous assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=212379
Anonymous assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.