7/6/2026 15:57:48 Closed by Cheyenne Bowlen
I have added this to our "paving request" list to be considered for future paving lists. I have added it to our patch list in the meantime.
Other: Please consider repaving Montclair Ave. It is a crumbling mess. Thank you.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 4 days have already passed.
I have added this to our "paving request" list to be considered for future paving lists. I have added it to our patch list in the meantime.