3/17/2026 14:50:19 Closed by Cheyenne Bowlen
This is on our maintenance list to make the necessary repairs when the asphalt plant reopens for the season.
Other: There was a pipe under our road that was replaced. Work done in the fall still needs to be completed with the finishing layer of blacktop added. The area is a dip in the road and very uneven. Driving over it makes me feel like my car tires might pop, or it is going to damage the rims of the tires. Thank you!
Most tickets of this type should be closed within 7 days, although some cases may be longer. 3 days have already passed.
This is on our maintenance list to make the necessary repairs when the asphalt plant reopens for the season.
| City | Bloomington |
|---|---|
| State | IN |
| Latitude | 39.189659118652 |
| Longitude | -86.517753601074 |
| Status | Case Date | Category | |
|---|---|---|---|
| closed | 3/11/2026 | Potholes, Other Street Repair | |
| closed | 4/4/2011 | Temporary Signage w/o permit |