Other: The sidewalk has a severe depression, due to faulty construction in 2024 or 2025. I reported this same problem seven months ago. (See Case #204111.) Nothing has been done to repair the sidewalk. Rain, snow and mud collect to such an extent that the sidewalk is often unusable – forcing pedestrians and bicyclists into a dangerous, high-speed street.
- Assigned to
- Tony Carroll
3/2/2026 11:46:41 Cheyenne Bowlen assigned this case to Tony Carroll
Sent notification to Tony Carroll, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=208941
Cheyenne Bowlen assigned this case to Tony Carroll
You can use the link to follow progress on this case.
3/2/2026 08:45:42 Ryan Robling assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=208941
Ryan Robling assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.
3/1/2026 01:18:11 Anonymous assigned this case to Ryan Robling
Sent notification to Ryan Robling, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=208941
Anonymous assigned this case to Ryan Robling
You can use the link to follow progress on this case.
3/1/2026 01:18:11 Opened by Anonymous