2/3/2026 11:00:54 Closed by Cheyenne Bowlen
Thank you for reporting this. This is on our patch list and we will send a crew out for repairs.
Other: While redoing the Templeton elementary playground over the past year and a half many heavy construction vehicles used the two blocks of South Park Ave as their main access point for construction. During that time the road conditions on those two blocks of South Park ave (from Grimes to Hillside) have worsened becoming hazardous, with many potholes that need to be avoided like obstacles to dodge left and right. There are no sidewalks on this street so many kids walk to Templeton in the street, with the potholes creating further distraction for drivers. The construction crew hired was very respectful of the neighborhood, but the additional wear from the large project needs to be prioritized and addressed. Thank you for your time.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 7 days have already passed.
Thank you for reporting this. This is on our patch list and we will send a crew out for repairs.
| City | Bloomington |
|---|---|
| State | IN |
| Zip | 47401 |
| Latitude | 39.150993347168 |
| Longitude | -86.523567199707 |
| Neighborhood Association | Bryan Park |
| Township | Perry |