open #204810
Potholes, Other Street Repair:
Other: Thank you for repaving of Sixth Street from Rogers to Elm Street. But, the worst part of that street is from Elm to just beyond the roundabout at Oak Street......it is in horrible condition for cars, bicycles or pedestrians. The street truly needs repaving all the way to Adams, but at least get to Oak Street. Thank you
- Assigned to
- Cheyenne Bowlen
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.