4/1/2025 06:45:50 Closed by Cheyenne Bowlen
Thank you for reporting this. W 6th St from N Rogers St to N Elm St is on our schedule to be resurfaced this spring by a contractor. I have added it to our patch list in the meantime.
Other: West Sixth Street between Maple and Adams.....street conditions are horrendous; needs to be totally resurfaced or something that will make it more driveable and safer for bikers, pedestrians and others
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.
Thank you for reporting this. W 6th St from N Rogers St to N Elm St is on our schedule to be resurfaced this spring by a contractor. I have added it to our patch list in the meantime.